EVM Connectors

3 EVM Connectors
This section describes the connectors, jumpers, and test points on the EVM as well as how to connect, set up,
and properly use the EVM.

3.1 EVM Test Points

Table 3-1
lists the test points and functional descriptions. All TPS3899 pins have a corresponding test point on
the EVM. These test points are located close to the pins for more accurate measurements.
Test Point Number
Test Point Silkscreen
TP1
TP2
TP3
TP4
TP5
TP6

3.2 EVM Jumpers

Table 3-2
lists the jumpers on the TPS3899EVM. As ordered, the EVM will have five jumpers and three shunts.
Jumper
J1
J2
J3
J4
J5
Closed (Shunt on R
J6
8
TPS3899EVM Voltage Supervisor User Guide

Table 3-1. Test Points

Function
Label
VDD
Connect to VDD pin
RESET
Connect to RESET pin
SENSE
Connect to SENSE pin
CTS
Connect to CTS pin
CTR
Connect to CTR pin
GND
Connect to GND pin

Table 3-2. EVM Jumpers

Default Connection
Description
Shorted
Both pins on J1 are shorted together. Connect either pin on jumper J1 to the
Shorted
Both pins on J2 are connected together. Use either pin on jumper J2 monitor
Closed (Shunt)
Closed (Shunt)
Connect a shunt to jumper J4 to use R1 as the pull-up resistor on the RESET
[pin
Connect a shunt to this jumper J5 for different configurations. Connect shunt
DIV
3] to GND [pin 2])
to R
DIV
Shorted
Both pins on J6 are connected together. Connect either pin on jumper J6 to
Copyright © 2020 Texas Instruments Incorporated
Description
Allows user to connect to VDD pin. The VDD pin
connects to the input power supply.
Allows user to monitor the RESET output pin.
Allows user to connect to SENSE pin. The SENSE
pin is the voltage that will be monitored by
Allows user to monitor the CTS pin. The CTS
capacitor sets the sense delay. Leave CTS pin
floating (no capacitor) for minimum sense delay.
Allows user to monitor the CTR pin. The CTR
capacitor sets the reset delay. Leave CTR pin
floating (no capacitor) for minimum reset delay.
Allows user to connect to GND.
input power supply.
the output RESET.
Connect a shunt to jumper J3 to short V
output pin.
and GND for voltage divider configuration. Connect shunt to GND and
SENSE to manually reset. Connect shunt to RESET and R
programmable push-button functionality.
connect to ground.
www.ti.com
TPS3899.
to VDD.
MON
for
DIV
SLVUBZ3 – SEPTEMBER 2020
Submit Document Feedback

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the TPS3899EVM and is the answer not in the manual?

Table of Contents