www.ti.com
1.1 Related Documentation
TPS3899 Nano 125 nA I
Q
and Reset Delay, SLVSFM0.
1.2 TPS3899 Applications
•
Grid Infrastructure (Circuit Breakers, Smart Meters, monitor and protection equipment)
•
Factory Automation (Field Transmitters, PLC)
•
Fire Safety Systems
•
Electronic Point of Sale
•
Portable, Battery-Powered Systems
2 Schematic, Bill of Materials, and Layout
This section provides a detailed description of the TPS3899EVM schematic, bill of materials (BOM), and layout.
SLVUBZ3 – SEPTEMBER 2020
Submit Document Feedback
Figure 1-2. Board Bottom
, 1% Accurate Voltage Supervisor, Push-Button Monitor with Programmable Sense
Copyright © 2020 Texas Instruments Incorporated
TPS3899EVM Voltage Supervisor User Guide
Introduction
3
Need help?
Do you have a question about the TPS3899EVM and is the answer not in the manual?