FIRST TEAM SPORTS Horizon Assembly Instructions Manual

FIRST TEAM SPORTS Horizon Assembly Instructions Manual

Competition portable volleyball net system

Advertisement

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Horizon and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for FIRST TEAM SPORTS Horizon

  • Page 2 First Team Sports, Inc. Horizon Portable Volleyball Systems (rev. 09/03/2020) NOTE: The above bill of materials applies to the volleyball system itself. Additional components may be included with your order such as judges stand. Bill of materials and installation instructions are included with any additional products provided with your order.
  • Page 3 UPRIGHT POST ASSEMBLY 1. There should be a set of instructions regarding transport and setup of the portable bases attached to the volleyball post on the winch base unit. Remove and read those instructions first so you understand how to raise and lower the vertical post. Note: There is a compression spring shipped inside each of the uprights.
  • Page 4 NET ATTACHEMENT 1. Loosen Post Tensioning Knobs and telescope silver tubes down to approximately 7’ from the floor. 2. Unpack Competition Volleyball Net G. Lay net out flat on the floor. Slide wooden dowels provided into the side pockets of net. Notice that the ropes are different lengths. The TOP of the net is the side with the SHORTER rope, called the TOP ROPE.
  • Page 5 HEIGHT ADJUSTMENT LABEL APPLICATION NOTE: Height labels are not factory installed to insure exact height regardless of surface conditions. 1. Loosen the tensioning knobs on each post and raise net so the when the winch is tightened the net height at the middle of the net is 7’ 4-1/8” (official women’s height). The net should be no more than ¾”...

Table of Contents