FIRST TEAM SPORTS Legend Jr. Series Assembly Instructions

FIRST TEAM SPORTS Legend Jr. Series Assembly Instructions

Advertisement

FIRST TEAM SPORTS, INC
Legend Jr. Series Assembly Instructions

Bill of Materials

A (1) Vertical Post
B (1) 45 Degree Extension Arm
C (1) Mounting Plate
D (6) 5/8"x 7" Hex Bolt
NOTE: Immediately unpack all components and cross check against bill of materials. Report
any shortages to First Team customer service at 1-888-884-6677.
1. Position the hole taking into consideration that the backboard will be approximately 52" from the
front of the vertical post.
E (6) 5/8" Hex Nut
F (6) 5/8" Flatwasher
G (6) 5/8" Lockwasher
H (2) Backboard Frame Support L (8) 3/8" Hex Nut
I (8) 3/8"x 1 ¼" Hex Bolt
J (8) 3/8" Flatwasher
K (8) 3/8" Lockwasher

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Legend Jr. Series and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for FIRST TEAM SPORTS Legend Jr. Series

  • Page 1 FIRST TEAM SPORTS, INC Legend Jr. Series Assembly Instructions Bill of Materials A (1) Vertical Post E (6) 5/8" Hex Nut I (8) 3/8"x 1 ¼" Hex Bolt B (1) 45 Degree Extension Arm F (6) 5/8" Flatwasher J (8) 3/8" Flatwasher C (1) Mounting Plate G (6) 5/8"...
  • Page 2 If you are mounting an acrylic backboard, don't forget to sandwich the other rubber gasket between the backplate of the rim and the face of the backboard. FIRST TEAM SPORTS, INC. 902 COREY ROAD HUTCHINSON, KS 67501...

This manual is also suitable for:

Legend jr. iiiLegend jr. selectLegend jr. select dualLegend jr. ultraLegend jr. proLegend jr. extreme ... Show all

Table of Contents