Download Print this page
FIRST TEAM SPORTS Golden Goal 44 Series Assembly Instructions Manual

FIRST TEAM SPORTS Golden Goal 44 Series Assembly Instructions Manual

Advertisement

Quick Links

Bill of Materials (per goal)
(1) Crossbar
(2) Upright Weldment
Note: There is (1) left & (1) right Upright
(2) Corner Splice
(2) Backstay #1 (Portable Only)
(2) Backstay #2 (Portable Only)
(2) Back Bar (Portable Only)
(1) Ground Bar (Portable Only)
(2) Wheel Assembly (Portable Only)
(2) Backstay Splice (Portable Only)
(4) Corkscrew Ground Stakes (Portable Only)
(2) European Backstay (Semi/Permanent Only)
(2) Ground Stem (Semi/Permanent Only)
(4) Net Stakes (Semi/Permanent Only)
*NOTE: Immediately unpack all components and cross check against bill of materials. Report any shortages to First Team customer
service at 1-888-884-6677.
(6) ½" x 1" Hex Bolt
(2) ½" x 6 ½" Hex Bolt
(6) ½" Lockwasher
(2) ½" Centerlock Nut
(4) 3/8" x 1 ¼" Hex Bolt
(8) 3/8" x 1 ¼" Carriage Bolt
(6) 3/8" x 2 ½" Hex Bolt
(6) 3/8" x 3" Hex Bolt
(24) 3/8" Flatwasher
(22) 3/8" Lockwasher
(18) 3/8" Hex Nut
(2) Optional Padding Spacer
(2) ½" Flatwasher

Advertisement

loading
Need help?

Need help?

Do you have a question about the Golden Goal 44 Series and is the answer not in the manual?

Questions and answers

Summary of Contents for FIRST TEAM SPORTS Golden Goal 44 Series

  • Page 1 Bill of Materials (per goal) (6) ½” x 1” Hex Bolt (1) Crossbar (2) ½” x 6 ½” Hex Bolt (2) Upright Weldment (6) ½” Lockwasher Note: There is (1) left & (1) right Upright (2) ½” Centerlock Nut (2) Corner Splice (4) 3/8”...
  • Page 4 Unpack all components. Identify each piece based on either Figure A (portable goals) or Figure B (permanent/semi-permanent goals). First, using (2) ½”x 1” hex bolts and (2) ½” lockwashers, secure (1) Corner Splice into each Upright as shown in Figure D. IMPORTANT!! If you plan to use soccer post padding on goal uprights, be secure corner splice to Upright at attachment hole #2 as shown in Figure D.
  • Page 5 STOP! If you are performing a PERMANENT OR SEMI-PERMANENT soccer installation, skip down to step number 13. PORTABLE (roll-around) installations proceed with step 4 below. Use (1) BACKSTAY SPLICE to assemble BACKSTAY #1 to BACKSTAY #2. Do this by inserting BACKSTAY SPLICE equally into #1 &...
  • Page 6 27. YOUR GOLDEN GOAL PERMANENT OR SEMI-PERMANENT SOCCER GOAL IS COMPLETE! ALWAYS OBSERVE AND OBEY ALL RECOMMENDATIONS AND WARNINGS!!! FIRST TEAM SPORTS, INC. 902 COREY ROAD HUTCHINSON, KS 67501 Customer Service & Technical Support – 1-888-884-6677...