Installing/Removing The Server In/From The Rack; Rack System Requirements - Fujitsu PRIMERGY RX200 S5 Operating Manual

Rack server
Hide thumbs Also See for PRIMERGY RX200 S5:
Table of Contents

Advertisement

Hardware installation
4.2
Installing/removing the server in/from the
rack
V
CAUTION!
Follow the safety instructions in chapter
page 25
page
34.
At least two people are needed to position the server into/out of the
rack.
The rack can tip over when more than one unit is removed.
The server may not occupy the top height unit of the rack (38 HU/42
HU PRIMECENTER Rack and/or DataCenter Rack), as otherwise
boards or fans cannot be replaced even with the plug-in module fully
extended.
4.2.1

Rack system requirements

The rack systems from Fujitsu Technology Solutions, PRIMECENTER Rack
and DataCenter Rack, support the installation of PRIMERGY servers.
Installation in most current rack systems from other manufacturers (3rd party
racks) is also supported.
To accommodate the ventilation concept and ensure proper ventilation, any
unused areas in the rack must be sealed using dummy covers.
The power is supplied via the multiple socket outlets fitted in the rack.
PRIMECENTER/DataCenter Rack
The main features of the rack systems from Fujitsu Technology Solutions are as
follows:
– Support systems that can be mounted without tools
The support systems have a linear alignment feature to ensure that they can
be adjusted to different rack depths.
– Enhanced cable management in the lateral rack area
RX200 S5

Installing/removing the server in/from the rack

and section
section "Notes on installing in the rack" on
Operating Manual
"Important information" on
39

Advertisement

Table of Contents
loading

Table of Contents