Overview Of The Configuration Steps - Siemens SIMATIC PCS 7 Manual

Maintenance station
Hide thumbs Also See for SIMATIC PCS 7:
Table of Contents

Advertisement

2 Overview of the Configuration Steps

Overview of the Configuration Steps
2
Depending on the architecture in which the PDM MS is used, different steps are
required to get the Maintenance Station up and running. The following table
provides an overview of which steps are necessary.
Table 2-1
Chapter
4 Commissioning the Microbox IPC [all]
5.1 Ethernet Settings in Windows [all]
5.2 Extended Ethernet Settings for PROFINET
[B1, B2]
5.3 Settings of the SIMATIC Manager [all]
5.4 PDM Settings [all]
6.1 Initialization of an IE/PB Link [A2]
6.2 Configuring the IE/PB Link Without DP
Master Function [A2]
7.1 Setting Up a Virtual COM Port [C2]
7.1.1 Setting Up the HART Server [Cx]
7.1.2 HART Multiplexer with Serial Connection
[C1, C2]
7.1.3 HART Multiplexer/Gateway with Ethernet
Connection [C3, C4]
8.1.1 Creating a Project on the Microbox IPC [all]
8.1.2 Project with PROFINET or PROFIBUS [Ax,
Bx]
8.1.3 Project with HART Server [Cx]
8.2 Using the Sample Project [all]
8.3.1 PROFIBUS and PROFINET Network via
S7-CPU [A1, B1]
8.3.2 PROFINET Network Directly via
Switch/Service Bridge [B2]
8.3.3 PROFIBUS Network via IE/PB Link [A2]
8.3.4 HART Multiplexer/Wireless HART Gateway
[Cx]
8.4.1 Projects with PDM [A1, A2, B1, B2]
8.4.2 Projects without PDM [A1, A2, B1, B2]
9 Engineering Steps for the Maintenance Station
[all]
PDM Maintenance Station
Entry ID: 109776936,
V1.0,
02/2020
PROFIBUS
PROFINET
A1
A2
B1
B2
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
HART Multiplexer
C1
C2
C3
C4
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
7

Advertisement

Table of Contents
loading

Table of Contents