Multi V 5
8. Electrical Wiring
■ Main function of SW02E
ON S/W
No.1
No.2
No.3
No.4
No.5
No.6
No.7
No.8
1. Selection of the method for pipe detection of an HR unit (Auto/Manual)
Switch No.1 Off
Master
2. Selection of Master/Slave Main PCB
Switch No.5 Off
Note
Do not turn on any SW02E on Slave Main PCB except No.5.
Method for pipe detection of an HR unit (Auto/Manual)
No. of connected branches
Master/Slave (Main PCB) Setting
EEPROM factory initialization (4,5,6)
Use only in factory production (preset to "OFF"), Zoning setting ("ON")
Use only in factory production (preset to "OFF"), Zoning setting ("ON")
Auto
Master
Slave
Installation of Outdoor Units
Selection
Manual
Switch No.1 On
Master
Slave
Switch No.5 On
Slave
41