Introduction And Description; Introduction; Description; Installation For Use - Peco 21621207-08 Operator's Manual

Pto grass collection system for cub cadet tank & lesco z2
Table of Contents

Advertisement

INTRODUCTION AND DESCRIPTION

1-1 Introduction

We are pleased to have you as a PECO customer. Your
collection system has been designed to give you a low
maintenance, simple, and effective way to collect the
grass clippings from your mower. This manual is
provided to give you the necessary instructions to
properly mount and operate the collection system on
your mower. Please read this manual thoroughly.
Understand what each control is for and how to use it.
Observe all safety decal precautions on the machine and
noted throughout the manual.
NOTE: all references made to right, left, front, rear, top
or bottom are as viewed from the normal operator's
position on the mower.

1-2 Description

The collection system is designed for turf maintenance
where there is a need to collect the grass clippings as
the mower cuts the turf. It is also good for picking up
leaves and twigs in pre-season and post-season clean-
up.
The blower, mounted on the right side of the unit, uses a
belt and gearbox system from the engine PTO shaft.
Drive train protection comes through belt slippage. The
blower draws grass clippings from the discharge area of
the cutter deck up to the aluminum container mounted
over the rear portion of the mower frame. The operator
can engage the blower with a push of the over-center
linkage on the right side of the unit. Once the container is
full of clippings, the operator can easily push and raise
the lift handle, releasing the container's rear door and the
container will pivot towards the ground.
Section II

INSTALLATION FOR USE

2-1 Preparation Of Mower

Carefully dismantle wooden shipping crate from around
the components. Cut retaining straps and separate the
parts. The collection system will have various parts
located inside. Remove and sort all parts for easy
identification.
NOTE: Before each step of assembly it will help to study
the exploded drawings on pages 10 through 15.
From the underside of the engine remove the bolt and
bushing from the electric clutch assembly. It will help to
use a bungee cord or similar device to hold the electric
clutch in place during this step.
SECTION I
Replace these parts with the engine pulley assembly
P#(A0745), 7/16" lock washer P#(K0140), and 7/16"-20
x 4" HHCS P#(K0359) for the 23HP & 25HP, or engine
pulley assembly P#(A0419), 7/16" lock washer
P#(K0140), and 7/16"-20 x 4" HHCS P#(K0359) for the
19HP. The added pulley will power the collection system.
Note that the center of the hub that is extended should
be upward toward the engine (Figure 2-1a.). Torque the
bolt to 55 ft./lbs.
Figure 2-1a.
Electric
Clutch
Removing The Weight Kit
Remove the two carriage bolts and flange nuts that
fasten the two existing weight bars to the rear frame of
the mower. Remove the weight bars. See the Figure 2-
1b.
Figure 2-1b.
5
Engine Pulley
Assembly
Remove Carriage
Bolts and Flange Nuts
Remove Weight Bars

Advertisement

Table of Contents
loading

This manual is also suitable for:

33621203-04

Table of Contents