Download Print this page

KidKraft HIGHLINE RETREAT Installation And Operating Instructions Manual page 24

Advertisement

Step 7: Playhouse Assembly
Part 2
D: Make sure that (071) Panel Assembly is fully open and that each wall is flush to the edges of the (051) Floor
Boards. Check to ensure that the assembly is square and install 4 (S3) #8 x 2 – ½" Wood Screws in each end
wall as shown in fig. 7.5.
S3
Flush
Flush
Fig. 7.5
071
S3
8 x
Hardware
#8 x 2-1/2" Wood Screw
S3
24
Flush
S3

Advertisement

loading

This manual is also suitable for:

F29060ef