Upgrading to High Capacity
16
Connect the D/480JCT-2T1 cables to the two new and two existing
Intel D/480JCT-2T1 PCI cards.
Note: Ensure that a single-point ground reference is available for all
the power outlets serving the CallPilot server and its peripherals.
Before the CallPilot server installation, a qualified electrician must
implement the single-point ground reference requirement between
the power outlets of the CallPilot server and the power outlets of the
switch.
17
Power up the server and log on to Windows.
Result: The Windows New Hardware Found Wizard screen
appears.
ATTENTION
18
Wait 10 minutes for the server to return to full service.
19
Click Next.
20
Select the presented Nortel MPB driver and click Next.
21
Repeat the previous two steps each time the Windows New
Hardware Found Wizard screen appears.
22
Restart the server.
Note: After restarting the server, you receive a dialog box indicating
you have new hardware. Click OK.
23
Run the Configuration Wizard to configure the new hardware.
For instructions, refer to the Installation and Configuration Task List
(555-7101-210).
180
Before clicking Next to install the hardware driver,
wait 10 minutes or until you see the dialog box
"CallPilot is running and is able to accept calls";
otherwise the server could display a blue screen and
then restart. If this happens, the server may not
recognize the installed cards and boards.