Long-Term Storage Of Vm-301-Pavermax - probst VM-301-K-PAVERMAX Operating Instructions Manual

Installation machine
Table of Contents

Advertisement

Description and Operation
Fig. E
4.7

Long-term storage of VM-301-PAVERMAX

If the installation machine must be stored during a longer period:
store the installation machine at an even and try place in a hall or,
place, when storing the installation machine outside on a timber platform and cover it completely with a dark
cover
protect the installation machine against direct sea-air (danger of corrosion!)
retract hoist cylinder
clean and oil all construction units (joints) and the motor complete, or lubricate according to the lubrication
chart
disconnect the battery from the motor
pour enough antifreeze into the cooling water in the winter months and refuel winter Diesel
place the attached installation clamp (HVZ) on the ground (lay timber beams under the steel grippers)
close main clamping at the installation clamp (HVZ)
open side clamping at the installation clamp (HVZ)
5150.0022+5150.0023 (41500820)
Fig. F
V3
24 / 36
GB

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vm-301-pavermax5150.00225150.0023

Table of Contents