General Information - Assa Abloy Rixson Smok-Chek VI Installation And Instruction Manual

Table of Contents

Advertisement

4 (Non-Detectored)
Closer/Holder Unit Assembly
(Handed)
Backplate
Mtg Screw (4)
Included with Pull Side or Double Egress
Track End
Cap (2)
Track Mtg
Screw (2)
Cushion Stop
Assembly
Included with Push Side
Certifications
UL228, UL10B
Copyright © 2010, 2014 Yale Security Inc., an ASSA ABLOY Group company. All rights reserved.
Reproduction in whole or in part without the express written permission of Yale Security Inc. is prohibited.

General Information

Power Supply
(120V units only)
Cover Mtg
Screw (6)
Cover
Pull Side Arm
Double Egress
Pull Side Arm (Handed)
Slide Track
Track Cover
Slide Assembly
Push Side
Arm Assembly
Arm Screw
Test/Power
Switch
Closer/Holder Unit Assembly
Backplate
Backplate
Mtg Screw (4)
Standard
Optional
16
6 (Dectectored)
Test/Power
(Handed)
Smoke Detector
Cover
Preparation for Fasteners
Door or Frame
Fasteners
1/4" - 20 machine
Metal
screw
Self tapping screw
Metal /
(Track screws only)
Wood
Self tapping screw
Metal /
(Closer mounting
Wood
screws only)
Hollow
Metal
Sleeve nuts and
bolts
(Shoe screws only)
Aluminum
or Wood
Through-bolts and
All
grommet-nuts
RIXSON
ASSA ABLOY
3000 Highway 74 East
Tel:
(800)-457-5670
www.r ixson.com
80-9372-0100-015 (02-14)
®
RIXSON
ASSA ABLOY
Switch
Backplate
Power Supply
(120V units only)
Cover Mtg
Screw (6)
Drill-Sizes
Drill: #7 (0.201" dia.)
Tap: 1/4" - 20
Pre-Drill: 9/64 hole
Pre-Drill: 3/16 hole
9/32" (7 mm) through;
3/8" (9.5 mm) door face
opposite to closer
3/8" (9.5 mm) through
9/32" (7 mm) thru;
3/8" (9.5 mm) dia. x
3/8" (9.5 mm) deep on
door opposite to closer
®
Monroe, NC 28112
Fax: (800)-221-0489

Advertisement

Table of Contents
loading

Table of Contents