Download Print this page

Draper FOUNDATION Installation Manual page 18

Hide thumbs Also See for FOUNDATION:

Advertisement

Foundation
Section 8.2 - Vertical Rail Assembly - For LED arrays 7 panels or higher - 3 Horizontal Rails
WORK GLOVES
RECOMMENDED
Section 8.2.1 - Lower Section of Vertical Rail Assembly
1. Insert Vertical Connector into TOP of the Lower Vertical Rail section and secure with provided hardware
A
VERTICAL
CONNECTOR
2. Turn the Lower Vertical Rail section over.
3. Attach two
Wall Adjuster Brackets
(2)
to the back side using a 3mm hex wrench.
Section 8.2.2 - Upper Section of Vertical Rail Assembly
1. Attach one
Wall Adjuster Bracket to the back side using a 3mm hex wrench.
(1)
for LED Panels
1
1
2
SCREW
M8-1.25x10mm
Long Flanged
Button Head
2
2
3
3
(3mm Hex Wrench)
TOP
TOP
TOP
TOP
TURN OVER
TURN OVER
TOP
TOP
page 18 of 32
.
Front
Front
Front
Front
Back
Back
3mm Hex
Wrench
engaged with
differential
screw

Advertisement

loading
Need help?

Need help?

Do you have a question about the FOUNDATION and is the answer not in the manual?

Questions and answers