Foundation
Section 6 - Adjusting and Aligning Horizontal Rails
SIDE
VIEW
SIDE
VIEW
1. Position three
Plum Alignment Pins on each horizontal rail ensuring one is at the far left, center and far right.
(3)
2. Using a 5mm Hex Wrench, loosen the four
3. Shine a laser level parallel to the wall with the laser intersecting the plum alignment pins.
4. Using a 3mm Hex Wrench, turn the two
(Please Note: when setting the plumb adjustment, the face of the horizontal rail must remain plump and not twisted)
5. Once the Laser Line and all Alignment Pins are aligned, tighten the four
3mm Hex
Wrench
for LED Panels
™
TOP VIEW -
Laser Line
TOP VIEW -
Laser Line
locking screws on the top and bottom of each of the four
(4)
adjustment set screws on each wall mounting bracket to position the Alignment Notch with the laser line
(2)
Alignment
Notch
LASER
LINE
After
After
Adjustement
Adjustement
CONVEX WALL
Laser Line
CONCAVE WALL
Laser Line
outer wall mounting brackets.
(4)
.
locking screws on the top and bottom each of the outer mounting bracket.
(4)
Alignment
page 16 of 32
Notch
LASER
LINE
Before
Adjustement
Need help?
Do you have a question about the FOUNDATION and is the answer not in the manual?
Questions and answers