Download Print this page

Draper FOUNDATION Installation Manual page 12

Hide thumbs Also See for FOUNDATION:

Advertisement

Foundation
Section 3.2 - Marking Vertical Mounting locations
Section 3.2.1 - WOOD/METAL STUD INSTALLATION
1. Locate the wall studs and mark their location at the intersection of the
lines drawn in Section 3.1.
Fig. 3.2-1
STUDS
SHOWN
Section 3.3 - Attaching Mounting Hardware
1. Loosely attach the wall mounting hardware
Ensure the head of the hardware is at least 1/2"
The assembled Horizontal Rails will be hung from these in SECTION 5 - Hanging Horizontal Rails.
G Y P S
U M
B O A
R D
M o u
n t i n g
H a r d
w a r e
(b y o t
h e r s )
W A L L
MOUNTING LAG SCREW
BY OTHERS MIN: .25" x 1.75" L
Must attach to studs or
1/2" Plywood Backer
MIN: .25" x 1.75" L
HEX HEAD LAG SCREW
BY OTHERS
Please Note: It is the responsibility of the installer to select mounting
hardware appropriate for the mounting surface
for LED Panels
(by Others)
to the wall at the outer four corners of the grid created in Sections 3.1 & Section 3.2.
(provided by others)
off the surface of the wall.
(12mm)
Fig. 3.3
P L Y W
O O D B
A C K E R
G Y P S
U M
B O A
R D
OR
M o u
n t i n g
H a r d
w a r e
(b y o th
e rs )
W A L L
Section 3.2.2 - CONCRETE, BLOCK OR BRICK INSTALLATION
1. Draw vertical lines spaced 24"
Fig. 3.2-2
MAX. WALL
BRACKET SPACING:
24"
to 32"
(610mm)
(813mm)
to Wall
Ø
/
"
5
16
(Ø7mm)
Ø
/
"
13
16
(Ø20mm)
MOUNTING
BRACKET
DETAIL
page 12 of 32
to 32"
apart.
(609mm)
(813mm)
Mounting
Hardware
LASER LINE
/
"
(Ø14mm)
9
16

Advertisement

loading
Need help?

Need help?

Do you have a question about the FOUNDATION and is the answer not in the manual?

Questions and answers