Foundation
Section 3.2 - Marking Vertical Mounting locations
Section 3.2.1 - WOOD/METAL STUD INSTALLATION
1. Locate the wall studs and mark their location at the intersection of the
lines drawn in Section 3.1.
Fig. 3.2-1
STUDS
SHOWN
Section 3.3 - Attaching Mounting Hardware
1. Loosely attach the wall mounting hardware
Ensure the head of the hardware is at least 1/2"
The assembled Horizontal Rails will be hung from these in SECTION 5 - Hanging Horizontal Rails.
G Y P S
U M
B O A
R D
M o u
n t i n g
H a r d
w a r e
(b y o t
h e r s )
W A L L
MOUNTING LAG SCREW
BY OTHERS MIN: .25" x 1.75" L
Must attach to studs or
1/2" Plywood Backer
MIN: .25" x 1.75" L
HEX HEAD LAG SCREW
BY OTHERS
Please Note: It is the responsibility of the installer to select mounting
hardware appropriate for the mounting surface
for LED Panels
™
(by Others)
to the wall at the outer four corners of the grid created in Sections 3.1 & Section 3.2.
(provided by others)
off the surface of the wall.
(12mm)
Fig. 3.3
P L Y W
O O D B
A C K E R
G Y P S
U M
B O A
R D
OR
M o u
n t i n g
H a r d
w a r e
(b y o th
e rs )
W A L L
Section 3.2.2 - CONCRETE, BLOCK OR BRICK INSTALLATION
1. Draw vertical lines spaced 24"
Fig. 3.2-2
MAX. WALL
BRACKET SPACING:
24"
to 32"
(610mm)
(813mm)
to Wall
Ø
/
"
5
16
(Ø7mm)
Ø
/
"
13
16
(Ø20mm)
MOUNTING
BRACKET
DETAIL
page 12 of 32
to 32"
apart.
(609mm)
(813mm)
Mounting
Hardware
LASER LINE
/
"
(Ø14mm)
9
16
Need help?
Do you have a question about the FOUNDATION and is the answer not in the manual?
Questions and answers