ABB Relion 670 Series Commissioning Manual page 83

Transformer protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 504 165-UUS Rev. J
IEC140000143 V1 EN-US
Figure 15:
Open the capture file and observe the captured synchrophasor data. In order to get the Phasor
names on top of each column (See figure 16), the capture process should start before connecting
the PMU Connection Tester to the PMU, i.e. first start the capturing and then click Connect.
Transformer protection RET670
Commissioning manual
Stop capturing the IEEE C37.118 synchrophasor data
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Establishing connection and verifying the IEEE C37.118/1344 communication
Section 9
IEC140000143-1-en.vsd
77