Figure 51:
where:
1
2
3.
Decrease slowly the voltage in phase VA of the test set until the PICKUP signal resets.
4.
Check V1 blocking level by comparing the voltage level at reset with the set undervoltage blocking
V1Low.
5.
Repeat steps
Check of V2Low
Procedure
1.
Connect voltages to the IED according to valid connection diagram and figure 52.
210
VA
VB
VC
VN
Connection of the test set to the IED for test of V1 block level
is three-phase voltage group1 (V1)
is three-phase voltage group2 (V2)
2
to
4
to check V1Low for the other phases.
The connections to V1 must be shifted to test another phase. (VA to VB, VB to VC,
VC to VA)
© 2017 - 2021 Hitachi Power Grids. All rights reserved
VA
VB
1
VC
VN
VA
2
VB
VC
ANSI07000106-1-en.vsd
Transformer protection RET670
1MRK 504 165-UUS Rev. J
SEMOD175258-91 v3
Commissioning manual

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ret670

Table of Contents