Preparation Of The Verification - ABB Relion 670 Series Commissioning Manual

Transformer protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

Section 11
Testing functionality by secondary injection
To test
set
-
ANSI04000202 V2 EN-US
Figure 58:
11.11.2.1

Preparation of the verification

1.
Check the function settings on the local HMI under Main menu/Settings /IED Settings/Control /
Autorecloser79,5(0–>1)/SMBRREC:x(79,5(0–>)):x
If any timer settings are reduced to speed up or facilitate the testing, they shall be set to normal
after testing. A temporary label on the IED can be a reminder to restore normal settings after which
a verification test should be performed.
2.
Decide if a synchrocheck function SESRSYN (25) shall be included in the test.
250
BI
BI
ST
SRY
Simulating the CB operation by a bi-stable relay/breaker simulator and manual
switches
© 2017 - 2021 Hitachi Power Grids. All rights reserved
SC
BR
ANSI04000202-1-en.vsd
1MRK 504 165-UUS Rev. J
M12400-40 v8
Transformer protection RET670
Commissioning manual