Section 11
Testing functionality by secondary injection
11.4.3.1

Phase-to-phase faults

IEC07000009 V4 EN-US
Figure 29:
Table 24:
Test
points
1
2
3
Change the magnitude and angle of phase-to-phase voltage to achieve impedances at test points 1, 2
and 3. For each test point, observe that the output signals, PICKUP, PU_x and PHPH_FLT are activated
where x refers to the actual phase to be tested. After the timer tPP for the actual zone has elapsed, also
the signals TRIP, TRPP and TR_x shall be activated.
11.4.3.2

Phase-to-ground faults

For simplicity, the same test points as for phase-to-phase faults are proposed, but considering new
impedance values.
114
X
3
50%
ZAngPP
Proposed test points for phase-to-phase fault
Test points for phase-to-phase (ohms / phase)
reach
Value
X
ZPP · sin(ZAngPP)
R
ZPP · sin(ZAngPP)
X
0,5· (ZPP· sin(ZAngPP)
R
0,5·ZPP + ΔR = 0,5·ZPP·(1+cos(ZAngPP))
X
0,5·ZPP·sin(ZAngPP)
R
0,5·ZPP - ΔR = 0,5·ZPP(1-cos(ZAngPP))
© 2017 - 2021 Hitachi Power Grids. All rights reserved
1
ZPP
2
R
Ohm/phase
IEC07000009-4-en.vsd
1MRK 504 165-UUS Rev. J
Comments
Transformer protection RET670
Commissioning manual
M14944-292 v8
M14944-393 v7

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ret670

Table of Contents