Activating Zcvpsof Externally; Initiating Zcvpsof Automatically And Setting Mode To Impedance; Initiating Zcvpsof Automatically And Setting Mode To Vilevel; Completing The Test - ABB Relion 670 Series Commissioning Manual

Transformer protection
Hide thumbs Also See for Relion 670 Series:
Table of Contents

Advertisement

1MRK 504 165-UUS Rev. J
Document
revision
F
G
I
11.4.13.2

Activating ZCVPSOF externally

1.
Set AutoInitMode to DLD disabled and Mode to Impedance.
2.
Activate the switch onto fault BC input.
During normal operating conditions, the BC input is de-energized.
3.
Apply a three-phase fault condition corresponding to a fault at approximately 45% of the line or with
impedance at 50% of the used zone setting and current greater than 30% of IBase.
The ZACC input is activated.
4.
Check that the TRIP output, external signals and indication are obtained.
11.4.13.3

Initiating ZCVPSOF automatically and setting mode to impedance

1.
Set AutoInitMode to Voltage and Mode to Impedance.
2.
Deactivate the switch onto fault BC input.
3.
Set the current and voltage inputs to lower than IphPickup and UVPickup for at least one second.
4.
Apply a three-phase fault condition corresponding to a fault at approximately 45% of the line or with
impedance at 50% of the used zone setting and current greater than 30% of IBase. Apply a two-
phase fault condition corresponding to a fault at approximately 45% of the line or with impedance at
50% of the used zone setting and current greater than 30% of IBase.
The ZACC input is activated.
5.
Check that the correct TRIP output, external signals and indication are obtained.
11.4.13.4

Initiating ZCVPSOF automatically and setting mode to VILevel

1.
Set AutoInitMode to Voltage and Mode to VILevel.
2.
Deactivate the switch onto fault BC input.
3.
Set the current and voltage inputs to lower than IphPickup and UVPickup for at least one second.
4.
Apply the three-phase currents in such a way that the magnitudes are greater than IphPickup and
the three-phase voltages in such a way that the magnitudes and lower than UVPickup at least for
the duration of the tDuration setting.
5.
Check that the correct TRIP output, external signals and indication are obtained.
11.4.13.5

Completing the test

Continue to test another function or end the test by changing the TESTMODE setting to Disabled.
Restore connections and settings to the original values, if changed for testing purposes.
11.4.14

Phase preference logic PPLPHIZ

Prepare the IED for verification of settings outlined in Section
Transformer protection RET670
Commissioning manual
Product
History
revision
2.2.4
-
2.2.4
Updated technical data for setting parameters tDuration, tDLD and tOperate.
2.2.5
-
© 2017 - 2021 Hitachi Power Grids. All rights reserved
Testing functionality by secondary injection
GUID-E83E1B3D-026C-48DB-BB9B-43C6597DE5DB v5
GUID-BD8EE7A0-710D-49C8-9B56-CB908BAF2C59 v8
"Preparing the IED to verify
Section 11
M13850-14 v8
M13850-27 v8
M13850-41 v5
settings".
161

Advertisement

Table of Contents
loading

This manual is also suitable for:

Ret670

Table of Contents