Bosch INTEGRUS Installation And Operating Manual page 18

Digital infra-red language distribution system
Hide thumbs Also See for INTEGRUS:
Table of Contents

Advertisement

INTEGRUS | Installation and Operating Manual | System description and planning
Caution: Turn the delay switches carefully
to a new position until you feel that it
clicks into position, to prevent that a
switch is positioned between two
numbers, which would result in a wrong
delay setting.
Note: When a master-slave configuration
is used for rooms which are always sepa-
rated, the delay switch positions can be
determined per system and the delay
caused by transmission from master to
slave transmitter can be ignored.
Figure 1.28, table 1.1, table 1.3 and table 1.4 illustrate
the calculation of the extra master-slave signal delay.
Table 1.3
Calculation of the master-to-slave signal delays
Cable length
master-slave
transmitter [m]
50
Table 1.4
Calculation of the delay switch positions of a system with two transmitters
Radiator Transmitter
number
1
Master
2
Master
3
Master
4
Master
5
Master
6
Slave
7
Slave
8
Slave
9
Slave
10
Slave
Bosch Security Systems | 2003-02 | 3122 475 22011en
Cable
signal delay
signal delay
per meter [ns/m]
5.6
50 x 5.6 = 280
Master-to-
Cable signal
slave signal
delay [ns]
0
168
0
280
0
112
0
168
0
280
313
168
313
280
313
112
313
168
313
280
R2
R5
R7
R10
20m
Figure 1.28 System with master and slave transmitter in
multi purpose room
Cable
Signal delay
slave transmitter
[ns]
[ns]
Total signal
delay [ns]
0+168 = 168
593-168 = 425
0+280 = 280
593-280 = 313
0+112 = 112
593-112 = 481
0+168 = 168
593-168 = 425
0+280 = 280
593-280 = 313
313+168 = 481
593-481 = 112
313+280 = 593
593-593 =
313+112 = 425
593-425 = 168
313+168 = 481
593-481 = 112
313+280 = 593
593-593 =
20m
30m
R1
20m
R3
20m
30m
R4
R6
20m
30m
R8
20m
R9
30m
Master-to-slave
signal delay [na]
33
280 + 33 = 313
Signal delay
Delay switch
difference
position
425/33 = 12.88 = 13
313/33 = 9.48 = 9
481/33 = 14.58 = 15
425/33 = 12.88 = 13
313/33 = 9.48 = 9
112/33 = 3.39 = 3
0
168/33 = 5.09 = 5
112/33 = 3.39 = 3
0
en | 12
Tx1
50m
Tx2
0/33 = 0
0/33 = 0

Advertisement

Table of Contents
loading

Table of Contents