Download Print this page

Landscape Forms Connect 2.0 Installation Manual

Advertisement

Quick Links

Connect 2.0
Shelter, wiring guide for 8ft solar powered unit
Installation Guide
Order of operations:
1.
Anchor kit installation
2.
Frame assembly
3.
Roof assembly
4.
Wall glass assembly
5.
Wiring connections
Tools Required
• wiring tools
• 3/32" hex key
• 3/16" hex key
• 5/16" Socket wrench
• Flat head screwdriver or ¼" socket wrench
Included components:
• Uplights, with wiring harnesses, pre‐installed in front horizontal beam
• Down lights, with wiring harness and connectors, one per rafter
• Wayfinding lights, with wiring harness, two per unit
• Glass solar panel with brackets and attaching hardware (instructions 
separate for roof panel)
• 16 batteries with wiring harnesses
ASSEMBLE WITH CARE! Pangard II Polyester Powdercoat is a strong, long‐lasting finish.  To 
protect this finish during assembly, place unwrapped powdercoated parts on packaging foam or 
other non‐marring surface.  Do not place or slide powdercoated parts on concrete or other hard 
or textured surface – this will damage the finish causing rust to occur.  Use touch‐up paint on any 
gouges in the finish caused by assembly tools.
DRIVER PLATE,
BATTERY INSTALL 
LOCATION
UPLIGHTS,
PRE‐INSTALLED
DOWNLIGHT,
LOCATION FOR 
CENTER SUB‐
HARNESS
BATTERY
INSTALL
LOCATION,
REAR 
HORIZONTAL
FRONT OF 
SHELTER
Fig. 1 – lighting component locations 8ft shelter
Date: February 14, 2019
www.landscapeforms.com
Ph: 800.521.2546
DOWNLIGHT
RIGHT 
FRONT
POST
WAYFINDING
LIGHTS
RIGHT 
REAR 
POST
Page 1 of 6

Advertisement

loading
Need help?

Need help?

Do you have a question about the Connect 2.0 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Summary of Contents for Landscape Forms Connect 2.0

  • Page 1 Connect 2.0 Shelter, wiring guide for 8ft solar powered unit Date: February 14, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 Order of operations: ASSEMBLE WITH CARE! Pangard II Polyester Powdercoat is a strong, long‐lasting finish.  To  Anchor kit installation protect this finish during assembly, place unwrapped powdercoated parts on packaging foam or  other non‐marring surface.  Do not place or slide powdercoated parts on concrete or other hard  Frame assembly or textured surface – this will damage the finish causing rust to occur.  Use touch‐up paint on any  Roof assembly gouges in the finish caused by assembly tools. Wall glass assembly Wiring connections DRIVER PLATE, Tools Required BATTERY INSTALL ...
  • Page 2: Installation

    Connect 2.0 Shelter, wiring guide for 8ft solar powered unit Date: February 14, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 INSTALLATION:  Unused grommets on rear horizontal beam can be sealed with clear or black  Order of installation: Install batteries. 8ft shelter will house 8 batteries in the front  silicone (supplied by others). horizontal beam and 8 batteries in the rear horizontal beam. They will connect together  Install left and right side rafter skins, with the sharper angle of the skin toward the  with a center sub‐harness. Install downlights. Install wayfinding lights. Connect wiring  front of the rafter. See Fig. 10. Rafter skins have a boss on the bottom flange that  harnesses to driver. Install fuse. Run test of lights. hooks into the downlight, see Fig. 10. Hook the bottom of the skin into position and  Remove access cover in horizontal beam near rear left post. Ensure Velcro strip is  then rotate the top of skin up to the rafter beam. Using a 3/16” hex key, install (2)  installed on rear horizontal beam. Secure one end of long Velcro harness to the top  ¼‐20 x ¾” socket head cap screws, located in hardware pack #62599. Tighten until  half of the strip mounted in the horizontal beam. Connect (‐) lead of the battery  gap between light and rafter skin is gone and rafter skin does not rattle. Do not  harness, labeled “BACK HARNESS”, to the first battery (‐). Install short jumper  overtighten screws.  harness to the positive pole of the battery as shown in Fig. 2. Attach the other end of  Wayfinding lights: Run wiring harness up through front vertical post. On the front  the jumper harness to the second battery. Install the second battery. Repeat this ...
  • Page 3 Connect 2.0 Shelter, wiring guide for 8ft solar powered unit Date: February 14, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 WIRING HARNESS LEAD – WIRING HARNESS LEAD – END WITHOUT FUSE END WITHOUT FUSE BATTERY BATTERY FACTORY‐INSTALLED VELCRO STRIP FACTORY‐INSTALLED VELCRO STRIP VELCRO HARNESS VELCRO HARNESS Fig. 2 – beginning of battery install in rear horizontal Fig. 3 – beginning of battery install in front horizontal FRONT REAR TO  FACTORY‐ SUB‐HARNESS  CENTER ...
  • Page 4 Connect 2.0 Shelter, wiring guide for 8ft solar powered unit Date: February 14, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 8 BATTERIES FRONT GROMMET IN FRONT SUB‐HARNESS  HORIZONTAL WITH FUSE CONNECT TO  FRONT  FRONT HARNESS WIRING  LONG  HARNESS  VELCRO QUICK  STRAP DISCONNECT CENTER SUBHARNESS (RAFTERS NOT  BACK WIRING SHOWN) HARNESS END...
  • Page 5 Connect 2.0 Shelter, wiring guide for 8ft solar powered unit Date: February 14, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 RAFTER (2) ¼‐20 x ½  SOCKET  HEAD CAP SCREW WIRING HARNESS  FOR WAYFINDING  FRONT  LIGHT HORIZONTAL  BEAM COVER PLATE GROMMET ATTACHMENT  POINT (3 PER SIDE) Fig. 12 – Install wayfinding  QUICK WAYFINDING  DOWNLIGHT light cover plate...
  • Page 6 Connect 2.0 Shelter, wiring guide for 8ft solar powered unit Date: February 14, 2019 Installation Guide www.landscapeforms.com Ph: 800.521.2546 FUSE LOCATION MORNINGSTAR  UNIT Fig. 14 – solar wiring connections (2) ¼‐20 x ½ SOCKET HEAD CAP SCREWS Fig. 13 – Install driver plate assembly, front right access hole Fig. 15 – solar wiring diagram Page 6 of 6...