Download Print this page

Landscape Forms Torres Installation Manual

Advertisement

Quick Links

Torres
Path Light, surface mount
Installation Guide
Surface Mount
Included hardware
1x – luminaire
cover
1x – luminaire 
head with 
driver plate
2x – M4 X 10
1x – cover 
1x – path 
Set screw
plate
light tube
Tools Required
• Safety glasses
• Screwdrivers
• Wiring tools and connectors
• 1/2" wrench or socket
• Hammer drill, with 1/2" dia bit
• 2mm, 3mm and 4mm hex keys
• Epoxy anchoring system for concrete
• Wire brush and compressed air for clearing anchor holes
LIGHTING LAYOUT RECOMMENDATIONS:
Light pole spacing is the responsibility of others. Refer to the Torres Path Light 
Product Data Sheet, available on www.landscapeforms.com, for light distribution 
options.
4x – M6 x 
4x – M6 
3x – M4 x 
tooth
16mm socket 
20mm socket 
button head 
lock washer
head cap screw
cap screw
4x – 5/16‐18 x 
1" hex hd bolt
1x – anchor
4x – concrete
template
anchor
ASSEMBLE WITH CARE! Pangard II Polyester Powdercoat is a strong, long‐lasting finish.  To protect this 
finish during assembly, place unwrapped powdercoated parts on packaging foam or other non‐marring 
surface.  Do not place or slide powdercoated parts on concrete or other hard or textured surface – this 
will damage the finish causing rust to occur.  Use touch‐up paint on any gouges in the finish caused by 
assembly tools.
2‐3/4"MAX
RECOMMENDED 
CONDUIT CLEARANCE
4x – 5/16 
washer
Fig. 1 – Minimum footing recommendation
[102mm]
4" dia.
ANCHOR HOLE
BOLT CIRCLE
Fig. 4 – Base plate detail
www.landscapeforms.com
1/2" – 3/4"
RECOMMENDED
CONDUIT SIZE
Fig. 2 – Recommended setback 
[102mm]
4" MIN
Fig. 3 – Minimum concrete slab size
FRONT 
OF LIGHT
Date: November 29, 2017
Ph: 800.521.2546
from sidewalk
EDGE OR
EXPANSION 
JOINT
[152mm]
6" MIN
Page 1 of 3

Advertisement

loading

Summary of Contents for Landscape Forms Torres

  • Page 1 Torres Path Light, surface mount Date: November 29, 2017 Installation Guide www.landscapeforms.com Ph: 800.521.2546 ASSEMBLE WITH CARE! Pangard II Polyester Powdercoat is a strong, long‐lasting finish.  To protect this  finish during assembly, place unwrapped powdercoated parts on packaging foam or other non‐marring  surface.  Do not place or slide powdercoated parts on concrete or other hard or textured surface – this  will damage the finish causing rust to occur.  Use touch‐up paint on any gouges in the finish caused by  assembly tools. 2‐3/4”MAX RECOMMENDED  Surface Mount CONDUIT CLEARANCE 1/2” – 3/4” RECOMMENDED CONDUIT SIZE Included hardware 4x – M6 x  4x – M6  1x – luminaire 3x –...
  • Page 2 Torres Path Light, surface mount Date: November 29, 2017 Installation Guide www.landscapeforms.com Ph: 800.521.2546 Landscape Forms is not responsible for site preparation and footings.  Footing recommendations are included in these instructions.  INSTALLATION PROCEDURE FOR PATH LIGHT: HEX BOLT Prepare footing as required by local codes, see Fig. 1, Fig. 2 and Fig. 3 for recommendations. Set wooden anchor template in position over conduit. The ‘F’ on the template indicates the front of the unit.  Mark anchor hole locations and remove the template. 5/16  Drill holes according to anchor size and depth, see Fig. 6. Clear holes of debris. WASHER Attach anchors to wooden anchor template as shown in Fig. 5.  Test fit template assembly with anchors into position before installing epoxy. Make any adjustments as necessary to allow  concrete anchors to freely install. Concrete anchor should sit centered in hole and not rest against the side of the drilled hole. TEMPLATE Add epoxy to anchor holes per epoxy manufacturer’s recommendations. Slowly set template assembly with anchors into position. Wipe away any excess epoxy before it cures. Allow epoxy to fully cure. Remove hex bolts and washers. Remove wooden template. 10. Set surface mount pole over concrete anchors and attach using hex bolts and washers as shown in Fig. 6. Align arrow on base  CONCRETE  plate with front location of path light. ANCHOR 11. Install cover plate over pole. Secure with 2 set screws (included). Align screws with two flat sides of base plate. See Fig. 7. 12. Make wiring connections (refer to page 3) between driver plate and line‐in supply wiring, see Fig. 8.
  • Page 3 Torres Path Light, surface mount Date: November 29, 2017 Installation Guide www.landscapeforms.com Ph: 800.521.2546 PROCEDURE FOR WIRING PATH LIGHT: The following schematic is to be used to connect the unit to line voltage.  It is the  responsibility of the installer to make sure that all connections are made in accordance  with the NEC and local building codes.  Connection hardware not included. INSTALLATION AND SERVICE SHOULD ONLY BE PERFORMED BY QUALIFIED PERSONNEL. Fig. 10 – Path light wiring schematic Page 3 of 3...