Dd9300 With Ds60 Standby Node Cabling Instructions - Dell EMC Data Domain DD9300 Installation Manual

Table of Contents

Advertisement

Table 12. DD9300 with DS60 primary node cabling instructions (continued)
String
I/O - Port
(Loop)
2
I/O 7 - Port 1
2
I/O 2 - Port 1
3
I/O 7 - Port 2
3
I/O 2 - Port 2
4
I/O 7 - Port 3
4
I/O 2 - Port 3
Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be used.
a.
Table 13. DD9300 with DS60 standby node cabling instructions
String
I/O - Port
(Loop)
1
I/O 7 - Port 0
1
I/O 2 - Port 0
2
I/O 7 - Port 1
2
I/O 2 - Port 1
3
I/O 7 - Port 2
3
I/O 2 - Port 2
4
I/O 7 - Port 3
4
I/O 2 - Port 3
Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be used.
a.
56
Connect Cables and Power On
Shelf Port
A controller port 0 of shelf V2.1
B controller port 0 of the highest number shelf in V2
A controller port 0 of shelf V3.1
B controller port 0 of the highest number shelf in V3
A controller HOST
port of the SSD shelf
B controller HOST
port of the SSD shelf
Shelf Port
B controller port 2 of shelf V1.1
A controller port 2 of the highest number shelf in V1
B controller port 2 of shelf V2.1
A controller port 2 of the highest number shelf in V2
B controller port 2 of shelf V3.1
A controller port 2 of the highest number shelf in V3
A controller EXPANSION
B controller EXPANSION
port of the SSD shelf
port of the SSD shelf
a
Length
2M
2M
2M
2M
2M
2M
a
Length
2M
2M
2M
2M
2M
2M
2M
2M

Advertisement

Table of Contents
loading

Table of Contents