Dd9300 With Es30 Standby Node Cabling Instructions - Dell EMC Data Domain DD9300 Installation Manual

Table of Contents

Advertisement

Table 9. DD9300 with ES30 primary node cabling instructions (continued)
String
I/O - Port
(Loop)
2
I/O 2 - Port 2
3
I/O 7 - Port 1
3
I/O 2 - Port 1
4
I/O 7 - Port 3
4
I/O 2 - Port 3
Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be used.
a.
Table 10. DD9300 with ES30 standby node cabling instructions
String
I/O - Port
(Loop)
1
I/O 7 - Port 0
1
I/O 2 - Port 0
2
I/O 7 - Port 2
2
I/O 2 - Port 2
3
I/O 7 - Port 1
3
I/O 2 - Port 1
4
I/O 7 - Port 3
4
I/O 2 - Port 3
Cable lengths shown are designed for Data Domain racks. Longer cables (up to 5M) can be used.
a.
52
Connect Cables and Power On
Shelf Port
A controller HOST
port of the highest number shelf in V2
B controller HOST
port of shelf V3.1
A controller HOST
port of the highest number shelf in V3
B controller HOST
port of shelf V4.1
A controller HOST
port of the highest number shelf in V4
Shelf Port
A controller EXPANSION
B controller EXPANSION
A controller EXPANSION
B controller EXPANSION
A controller EXPANSION
B controller EXPANSION
A controller EXPANSION
B controller EXPANSION
port of shelf V1.1
port of the highest number shelf in V1
port of shelf V2.1
port of the highest number shelf in V2
port of shelf V3.1
port of the highest number shelf in V3
port of shelf V4.1
port of the highest number shelf in V4
a
Length
2M
2M
2M
3M
3M
a
Length
2M
2M
2M
2M
2M
2M
3M
3M

Advertisement

Table of Contents
loading

Table of Contents