Furuno WR110 Installation Manual page 26

Weather radar
Hide thumbs Also See for WR110:
Table of Contents

Advertisement

Service engineer
Height = 1650
Figure 4.7: [Front view] Lifting up the upper radome and fix by threaded bolts.
Arm length = 600
Height = 1650
It recommends 400mm depth if using storable type because
when it exceeds 400 mm, it becomes heavy and hard to store.
Otherwise use 600mm depth to fix scaffold.
Figure 4.8: [Side view] This scaffold side is for removing the upper radome
Upper radome
Upper radome
Service engineer
20
(mm)
Required height when
lifting up the upper
radome
Height is different
as Figure 4.5
Standing position of
scaffold when lifting up
the upper radome
(mm)

Advertisement

Table of Contents
loading

Table of Contents