Installation; Mechanical Installation; Important Notes - Lenze 9300 Operating Instructions Manual

Servo positioning controller
Hide thumbs Also See for 9300:
Table of Contents

Advertisement

Show/Hide Bookmarks
4
4.1
4.1.1

Installation

Mechanical installation

Important notes

Use the controllers only as built-in devices!
If the cooling air contains pollutants (dust, fluff, grease, aggressive gases):
– Take suitable preventive measures , e.g. separate air duct, installation of filters, regular
cleaning, etc.
Observe free space!
– You can install several controllers next to each other without free space in a control cabinet.
– Ensure unimpeded ventilation of cooling air and outlet of exhaust air!
– Allow a free space of 100 mm at the top and at the bottom.
Do not exceed the ambient temperature permissible during operation.
With continuous oscillations or vibrations:
– Check whether shock absorbers are necessary.
Possible mounting positions
Vertically on the control cabinet back panel with mains connections at the top:
With enclosed fixing rails or fixing brackets.
Thermally separated with external heat sink
^
– Punching
(
4-3)
– "Cold Plate technique"
^
(
4-2)
^
(
4-6)
BA9300POS EN 2.3
Installation
^
(
3-2)
4-1

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents