Mindsphere Access - Step 5/7 - Siemens Simotics Connect 400 Operating Instructions Manual

Hide thumbs Also See for Simotics Connect 400:
Table of Contents

Advertisement

Procedure
1. Change the measurement interval. The "Calculated battery life" is updated.
2. Change the synchronization interval. The "Calculated battery life" is updated.
3. Move on to the next step with the "NEXT" button.
6.2.4.6

MindSphere Access - Step 5/7

In the following step, you establish the MindSphere access for onboarding. The process applied
from connecting and registering the connectivity module through to the MindSphere
application "SIDRIVE IQ Fleet", including all settings, is called onboarding.
SIMOTICS CONNECT 400
Operating Instructions, 08/2021, A5E50161952B AE
Commissioning
6.2 Commissioning with Android
35

Advertisement

Table of Contents
loading

Table of Contents