Final Work Steps

IQ test

Perform IQ test according to instructions SPR2-330.820.01.xx.xx.

Completing protocols

After completing all adjustment work steps and check measurements, the responsible
technician must sign and date the test protocols and country-specific protocols to confirm
that all values have been correctly determined and recorded.

Protective conductor resistance test

Transferring the values from the test protocol to the "protective conductor" proto-
col
NOTE
Complete the "Protective Conductor Resistance" protocol found in the "Protocol" sec-
tion of this manual.
If the system test protocol only contains the confirmation of the protective conductor
resistance threshold, enter this value in the "Protective conductor resistance" table, row
"Measurement point 1", column "First measured value" (< 0.18 Ohm). Enter "n.a." in
rows "measurement point 2" through "measurement point 22" of column "First mea-
sured value."
If the system test protocol specifies the measured protective conductor resistance val-
ues and their measurement points, transfer the values to rows "Measurement point 1"
through "Measurement point 22" of column "First measured value". Mark empty fields
with "n.a." as "not applicable".
In row "(1) Meas. circuit", column "First measured value", enter the text "VDE0751-1
Image C2".
ARCADIS Avantic
Remove the supplied IQ test protocols from the monitor cart service compart-
ment.
If no covers were opened while installing the system and no addi-
tional components (e.g. options) were installed or modified, the
values recorded in the test protocol 1 can be transferred as the
first measured value.
The protective conductor test need not be performed.
Perform the protective conductor resistance test if the conditions
specified above do not apply.
Refer to the section "Protective conductor resistance test during
start-up (if necessary)".
SPR2-330.815.01.03.02
12.06
Final Work Steps
Page 46 of 66
CS PS SP
4.1
0
0
0
Siemens AG
Medical Solutions

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents