P rimeGe ar Z X0 P R O D U C T M A N U A L
• Carefully slide the panel to be installed up to the
panel which is already in place.
• Check the position of the panel and align the
panel to the precise dimensions if necessary.
• Fasten the low voltage compartments, the
operating mechanism bays and the cable
termination compartments of the two panels
together at the points provided (Fig.2.3.2.4)
using screws and nuts.
Fig. 2.3.2.4: Fastening
points for panel to
panel bolting
3)
3)
Fig. 2.3.2.4
Apply drawing or pressing tools to a large
area on the panel directly above the floor
(for instance by using a wooden beam
between the tool and the panel) so as to
avoid damage to the panel.
1)
1)
3)
• In Fig.2.3.2.4, point 1 and 2 are for panel
connection; point 3 is for end cover connection.
• Fit the coupling link at the rear of the panels.
• Fasten the panel to the foundation frame as
described above.
• Measure the centre to centre distances L of the
adjacent cast resin busbar bushings (Fig.2.3.2.5)
for all three phases. The specified dimensions
for distance L can be found in table 2.3.2.1.
• If the measured dimension L deviates from that
specified, correct the position of the panel.
1)
1)
1)
1)
1)
1)
1)
1) Rivet nut, M 8 (installed on the left side of panel)
Cheese head screw, M 8 x 35 (fastened on the
right side from adjacent panel)
Dished washer, 8 (fastened on the right side from
adjacent panel)
2) Cheese head screw, M12 x 50 Nut M12, 2 x dished
1)
washer, panel connection spacer 2RJA026473P0001
3) Rivet nut, M8 (installed on the left side of panel
for end cover connection)