ABB PrimeGear ZX0 Product Manual page 14

Gas-insulated medium voltage switchgear
Hide thumbs Also See for PrimeGear ZX0:
Table of Contents

Advertisement

14
PrimeGe ar Z X0 P R O D U C T M A N U A L
Fig. 2.2.1.2: Installation
of the floor frame
2
1
Fig. 2.2.1.2
7
1
front
*
Floor topping
*: Only in the case of reinforced foundation frames.
A
A
Section A-A
Rear
Top of finished floor
6
*
1
2
3
4
5

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents