I N S T A L L A T I O N O F T H E S W I T C H G E A R A T S I T E
Step 3
Screw the phase support of three phases with
interface plate as shown in Fig. 2.3.4.5.3. Pay
attention that there are also two screws between
phase support.
Fig. 2.3.4.5.3 Screwing
the phase support
with interface plate
Fig. 2.3.4.5.4
Installation the current
transformer
Phase support
Fig. 2.3.4.5.3
10 x Cheese head screw M8x20
10 x Dished washer, 8
Step 4
• During installation of the busbars, guide the
busbar through the aperture in the current
transformer. Avoid damage to the conductive
layer of the busbar.
• On completion of busbar installation, screw the
base plates of the current transformers to the
previously fitted mounting plates as shown in
Fig.2.3.4.5.4.
Fig. 2.3.4.5.4
29
4 x Cheese head
screw M8x20
4 x Dished washer, 8