Calibrating The Seed Rate - Implements With Amadrill 2 Control Terminal Or Implements With Isobus System - Amazone Cataya 3000 Special Operating Manual

Pack top seed drill
Hide thumbs Also See for Cataya 3000 Special:
Table of Contents

Advertisement

Settings
8.4.2
Calibrating the seed rate -
Implements with AmaDrill 2 control terminal or
Implements with ISOBUS system
1. Prepare the implement for calibration, see
section "Calibrating the seed rate",
page 141.
2. Pre-calibrate the seed drill.
Pre-calibration creates the same conditions
as when driving on the field later on.
2.1 Pre-calibrate the seed drill
based on the operating manuals
"ISOBUS software" or
"AmaDrill 2".
2.2 Empty the two-part collection bucket
(Fig. 182/1) into the seed hopper, as-
semble, and push it into the holder up
to the stop with the opening facing up.
3. Calibrating the seed rate.
3.1 Calibrate the seed drill
based on the operating manuals
"ISOBUS software" or
"AmaDrill 2".
3.2 Unfold the bracket (Fig. 183/1) for
weighing the collected seed rate.
3.3 Weigh the content of the collection
bucket in the collapsible bucket.
Check the scales to ensure the display
is accurate, taking the container weight
into consideration.
4. Repeat the calibration test until the desired
seed rate is achieved.
150
Fig. 182
Fig. 183
Cataya Special BAH0109-1 02.21

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Cataya 3000 Special and is the answer not in the manual?

Table of Contents