Sign In
Upload
Manuals
Brands
Amazone Manuals
Farm Equipment
AD 3000 Super Classic Line
Amazone AD 3000 Super Classic Line Manuals
Manuals and User Guides for Amazone AD 3000 Super Classic Line. We have
1
Amazone AD 3000 Super Classic Line manual available for free PDF download: Operating Manual
Amazone AD 3000 Super Classic Line Operating Manual (198 pages)
Pack top seed drill
Brand:
Amazone
| Category:
Farm Equipment
| Size: 29 MB
Table of Contents
Table of Contents
5
1 User Information
10
2 General Safety Instructions
11
Obligations and Liability
11
Representation of Safety Symbols
13
Organisational Measures
14
Safety and Protective Equipment
14
Informal Safety Measures
14
User Training
15
Safety Measures in Normal Operation
16
Danger from Residual Energy
16
Maintenance and Repair Work, Fault Elimination
16
Design Changes
16
Spare and Wear Parts and Aids
17
Cleaning and Disposal
17
Workstation of the Operator
17
Warning Symbols on the Implement
18
Position of Warning Symbols
24
Dangers in Case of Non-Compliance with the Safety Instructions
25
Safety-Conscious Working
25
Safety Information for Users
26
General Safety Instructions and Accident Prevention Instructions
26
Hydraulic System
30
Electrical System
31
Mounted Implements
32
Operation of the Seed Drill
33
Cleaning, Maintenance and Repair
34
3 Loading and Unloading the Implement Upon Delivery
35
4 Product Description
36
Components of the AMAZONE Seeding Combination
36
Assembly Groups of the AD 3000 Super Pack Top Seed Drill
37
Safety and Protective Equipment
39
Overview - Supply Cable / Hydraulic Hose Lines
40
Supply Cable
40
Identification of the Hydraulic Hose Lines
40
Connection and Function of the Tractor Control Units
41
Transportation Equipment
42
Proper Use
43
Approved AMAZONE Implement Combinations
44
Danger Areas and Danger Points
45
Rating Plate and CE Mark
46
Technical Data
47
Noise Production Data
47
Technical Data for Calculating the Tractor Weight and the Tractor Axle Loads
48
Tractor Equipment
49
Operating Pressure of the Hydraulic System
49
5 Structure and Function
50
AMAZONE Amalog+ Control Terminal
53
Implement Documentation
53
Seed Hopper and Loading Board
54
Fill Level Monitoring
54
Rapeseed Insert
55
Seed Hopper Partition Wall
55
Seeding Shaft Drive
56
Metering
57
Setting Values
58
Normal and Fine Seed Metering Wheel
60
Fine Seed Metering Wheel Brushes
60
Bean Seed Metering Wheel
60
Bottom Flaps
61
Slide Gate
62
Agitator Shaft Support
62
Seed Rate Calibration
63
Rotec Control Coulter
66
Coulter Pressure and Seed Placement Depth
68
Coulter Pressure Adjustment, Manually Actuated
68
Coulter Pressure Adjustment, Hydraulically Actuated
69
Exact Following Harrow
70
Exact Following Harrow Tine Position
71
Exact Following Harrow Pressure
72
Roller Harrow with Contour Guidance
73
Tramlines
74
Tramline Control, Tabular Determination
75
Tramline Control, Graphic Determination
76
Functional Description
78
5.12.3.1 Lay Shaft Coupling, Electrically Actuated
79
One-Sided Switching
80
Tramline Control 2 and 21
81
Tramline Marker
81
Track Marker
82
6 Initial Operation
83
Checking the Suitability of the Tractor
84
Calculating the Actual Values for the Total Tractor Weight, Tractor Axle Loads and Tyre Load-Bearing Capacity, as Well as the Required Minimum Ballast Weight
85
Data Required for the Calculation (Attached Implement)
86
Calculation of the Required Minimum Ballast Weight at the Front G
87
To Ensure Steering Capability
87
Min of the Tractor
87
Calculation of the Actual Front Axle Load of the Tractor T
87
Calculation of the Actual Total Weight of the Combined Tractor and Implement
87
Tat
87
Calculation of the Actual Rear Axle Load of the Tractor T
87
Load-Bearing Capacity of the Tractor Tyres
87
H Tat
87
Table
88
Secure the Tractor / Implement against Unintentional Starting and Rolling Away
89
7 Coupling and Uncoupling the Implement
90
Hydraulic Hose Lines
92
Coupling the Hydraulic Hose Lines
92
Disconnecting the Hydraulic Hose Lines
93
Safety Instructions for Coupling the Seed Drill
94
Coupling and Uncoupling the Implement Combinations - Overview
96
SG (Made by Güttler) ● Simplex Prismatic Roller SX-45 SU (Made by Güttler)
97
Uncoupling the Seed Drill from KG/KE/KX 00 Soil Tillage Implements with 1-Tube
100
SG (Made by Güttler) ● Simplex Prismatic Roller SX-45 SU (Made by Güttler)
100
Mounting the Seed Drill on KG/KE/KX 00 Soil Tillage Implements with 2-Tube System Roller Frames ● Tooth Packer Roller PW 600 ● Wedge Ring Roller KW 580
103
Uncoupling the Seed Drill from KG/KE/KX 00 Soil Tillage Implements with 2-Tube System Roller Frame Tooth Packer Roller PW 600 Wedge Ring Roller KW 580
108
Trapeze Ring Roller TRW 600 ● Simplex Prismatic Roller SX-50 SG (Made by Güttler) ● Simplex Prismatic Roller SX-56 SU (Made by Güttler)
112
Trapeze Ring Roller TRW 600
116
Uncoupling - Seeding Combination from the Tractor (All Types)
120
8 Settings
121
Folding the Steps up and down
122
Moving the Star Wheel into Transport/Working Position
124
Moving the Star Wheel to the Working Position
124
Move the Star Wheel to the Transport Position
125
Fill the Seed Hopper
126
Placing the Calibration Trays on the Funnel Rail
129
Setting the Seed Rate
130
Seeding with the Normal or Fine Seed Metering Wheel
130
Seeding with Bean Seed Metering Wheels
132
Adjusting the Sliding Shutters
133
Bottom Flap Position
134
Agitator Shaft Support
135
Mounting the Rapeseed Insert
136
Calibrating the Seed Rate
137
Determining the Gearbox Setting Using the Calculating Disc Rule
140
Rotec Control Coulter
141
Adjusting and Checking the Seed Placement Depth
141
Adjusting the Depth Control Discs / Wheels
142
Coulter Pressure
144
Coulter Pressure Adjustment (Manual Adjustment)
144
Hydr. Coulter Pressureadjustment
145
Adjusting the Exact Following Harrow
146
Moving the Exact Following Harrow to the Working/Transport Position
146
Move the Exact Following Harrow into Working Position
146
Moving the Exact Following Harrow into Transport Position
146
Adjusting the Exact Following Harrow Tines by Rebolting the Brackets
147
Infinitely Variable Adjustment of the Exact Following Harrow Tines
147
Setting the Exact Following Harrow Pressure
148
Adjusting the Roller Harrow
149
Setting the Pitch of the Tines to the Ground
149
Working Depth Adjustment of the Harrow Tines
149
Setting the Roller Contact Pressure
150
Deactivating/Activating the Roller Harrow
152
Deactivating the Roller Harrow (Lifting)
152
Activating the Roller Harrow (Lowering)
153
Activating/Deactivating Tramline Control
153
Activating Tramline Control
153
Deactivating Tramline Control
153
Moving the Track Marker to the Working / Transport Position
154
One-Sided Switching
155
Deactivating the Left Side of the Seeding Shaft
155
Activating the Left Side of the Seeding Shaft
155
Moving the Tramline Marker into Working/Transport Position
156
Move the Tramline Marker to Working Position
156
Move the Tramline Markers to the Transport Position
157
Moving the Exact Following Harrow Road Safety Bar into Road Transport/Parking Position
158
Moving the Road Safety Bar into Road Transport Position
158
Moving the Road Safety Bar into Parking Position
158
9 Transportation
159
Moving the Seeding Combination into Transport Position
159
Legal Regulations and Safety
160
10 Use of the Implement
164
Initial Operation
165
Moving the Implement from Transport into Working Position
165
During Operation
166
Overview of Checks During Operation
166
Seeding Check
167
Turning at End of the Field
168
Track Marker
169
End of Work on the Field
169
Emptying the Seed Hopper and Seed Housing
170
11 Faults
173
Residual Seed Quantity Display
174
Deviations between the Set and Actual Seed Rate
174
12 Maintenance and Repairs
175
Maintenance Schedule
175
Lubrication Schedule
176
Lubrication Points
176
Safety
177
Safety When Cleaning the Implement
178
Safety When Working on the Hydraulic System
179
Installations
180
Shutdown of the Implement over a Long Period of Time
180
Folding down the Lay Shaft
180
Folding up the Lay Shaft
182
Setting the Tramline Spacing, Track Width and Wheelmark Width
183
Installing the Bean Metering Wheels
185
Maintenance
188
Visual Inspection of the Upper and Lower Link Pins
188
Visual Check of the Hydraulic Hose Lines and Couplings
189
12.5.2.1 Date of Manufacture of the Hydraulic Hose Line
189
Checking Roller Chains and Chain Wheels
190
Bottom Flaps Basic Position
190
Vario Gearbox, Check the Oil Level
191
Repairs (Specialist Workshop Work)
192
Checking the Hydraulic Hose Lines
192
12.8.1.1 Safety When Working on Hydraulic Hose Lines
193
Oils and Greases
194
Vario Gearbox Gear Oil
194
Lubricants for Grease Nipples and Grease Guns
194
Bolt Tightening Torques
195
Advertisement
Advertisement
Related Products
Amazone AD 3000 Special
Amazone AD 3000 Super
Amazone AD - 303 Special
Amazone AD - 303 Super
Amazone AD - 353 Super
Amazone AD 3500 Super
Amazone AD-P 3501 Special 850
Amazone AD-P 03 SPECIAL
Amazone AD-P 303 Super
Amazone AD-P 303 Special
Amazone Categories
Farm Equipment
Tiller
Spreader
Desktop
Paint Sprayer
More Amazone Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL