Compliance With Ul Regulations - MSA fieldserver EZ Gateway M-Bus to Modbus & BACnet Startup Manual

Table of Contents

Advertisement

9.4

Compliance with UL Regulations

For UL compliance, the following instructions must be met when operating EZ Gateway.
The units shall be powered by listed LPS or Class 2 power supply suited to the expected operating
temperature range.
The interconnecting power connector and power cable shall:
o
Comply with local electrical code
o
Be suited to the expected operating temperature range
o
Meet the current and voltage rating for EZ Gateway/Net
Furthermore, the interconnecting power cable shall:
Be of length not exceeding 3.05m (118.3")
o
o
Be constructed of materials rated VW-1, FT-1 or better
If the unit is to be installed in an operating environment with a temperature above 65 °C, it should
be installed in a Restricted Access Area requiring a key or a special tool to gain access.
This device must not be connected to a LAN segment with outdoor wiring.
EZ Gateway Start-up Guide
Additional Information
54

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the fieldserver EZ Gateway M-Bus to Modbus & BACnet and is the answer not in the manual?

Questions and answers

This manual is also suitable for:

Fs-ezx-mbus-md-bac

Table of Contents