Compliance With Ul Regulations - MSA fieldserver ProtoCarrier Operating Manual

Table of Contents

Advertisement

10.8 Compliance with UL Regulations

For UL compliance, the following instructions must be met when operating the ProtoCarrier.
The units shall be powered by listed LPS or Class 2 power supply suited to the expected operating temperature range.
The interconnecting power connector and power cable shall:
◦ Comply with local electrical code
◦ Be suited to the expected operating temperature range
◦ Meet the current and voltage rating for the FieldServer
Furthermore, the interconnecting power cable shall:
◦ Be of length not exceeding 3.05m (118.3")
◦ Be constructed of materials rated VW-1, FT-1 or better
If the unit is to be installed in an operating environment with a temperature above 65 °C, it should be installed in a
Restricted Access Area requiring a key or a special tool to gain access.
This device must not be connected to a LAN segment with outdoor wiring.
ProtoCarrier Start-up Guide
39

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the fieldserver ProtoCarrier and is the answer not in the manual?

Questions and answers

Table of Contents