Compliance With Ul Regulations - MSA fieldserver ProtoNode Operating Manual

Table of Contents

Advertisement

10.8 Compliance with UL Regulations

For UL compliance, the following instructions must be met when operating the ProtoNode.
The units shall be powered by listed LPS or Class 2 power supply suited to the expected operating temperature range.
The interconnecting power connector and power cable shall:
◦ Comply with local electrical code
◦ Be suited to the expected operating temperature range
◦ Meet the current and voltage rating for the FieldServer
Furthermore, the interconnecting power cable shall:
◦ Be of length not exceeding 3.05m (118.3")
◦ Be constructed of materials rated VW-1, FT-1 or better
If the unit is to be installed in an operating environment with a temperature above 65 °C, it should be installed in a
Restricted Access Area requiring a key or a special tool to gain access.
This device must not be connected to a LAN segment with outdoor wiring.
ProtoNode Start-up Guide
41

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the fieldserver ProtoNode and is the answer not in the manual?

Questions and answers

Edgar Ramirez
March 27, 2025

where can i purchase

Sergio Casas
April 18, 2025

Bacnet/IP.......BBMD setup. Need instructions

Table of Contents

Save PDF