10.5 Compliance with UL Regulations

For UL compliance, the following instructions must be met when operating the ProtoNode.
The units shall be powered by listed LPS or Class 2 power supply suited to the expected operating
temperature range.
The interconnecting power connector and power cable shall:
o
Comply with local electrical code
o
Be suited to the expected operating temperature range
o
Meet the current and voltage rating for the ProtoNode
Furthermore, the interconnecting power cable shall:
Be of length not exceeding 3.05m (118.3")
o
o
Be constructed of materials rated VW-1, FT-1 or better
If the unit is to be installed in an operating environment with a temperature above 65 °C, it should
be installed in a Restricted Access Area requiring a key or a special tool to gain access.
This device must not be connected to a LAN segment with outdoor wiring.
ProtoNode Start-up Guide
Additional Information
44

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the fieldserver ProtoNode FPC-N54 and is the answer not in the manual?

Questions and answers

Subscribe to Our Youtube Channel

Table of Contents

Save PDF