Download Print this page

Body Solid Powerline PFT50 Owner's Manual page 22

Functional trainer

Advertisement

PFT50
STEP 6
BE CAREFUL TO ASSEMBLE ALL COMPONENTS
IN THE SEQUENCE THAT THEY ARE PRESENTED.
NOTE:
finger tighten all hardware FIRST. wrench tighten all hardware
at the END of this step. some components may be pre-assembled.
nylon lock nuts will not fully screw onto bolts, must wrench tighten.
6A. Route Cable (#4) while installing Pulleys (#8) on the left side
of the machine as shown in step 6 drawing using:
11 - (#19) M10X45mm Hex Head Bolt
22 - (#27) M10 Washer
11 - (#29) M10 Nylon Lock Nut
6B. Attach Snap Link (#6) & Steel Chain (#7) to Cable (4) on each
side of the machine and then hook the other end of the Steel
chain (#7) onto each hook of the Single Pulley Holder (L).
22

Advertisement

loading