Visual & Daily Maintenance Inspections
4.2-6 Control compartment
Ensure all compartment latches are secure and in
proper working order.
Base control console
1
Ensure all switches are returned to their
▪
neutral positions.
Ensure there are no loose or missing parts and
▪
there is no visible damage.
Main manifold
2
Ensure all fittings and hoses are properly
▪
tightened and there is no evidence of hydraulic
leakage.
Ensure there are no loose wires or missing
▪
fasteners.
SJ30 AJE SJ30 ARJE
Section 4 – Pre-operation
1
2
213213AAA
41