Chapter 8: Hardware Installation for Synchronous Mirroring
10. The primary site connection is now complete. Is the secondary site connection
complete?
No – Repeat step 1 through step 9 for the secondary site.
Yes – Go to step 11.
11. Complete fabric 1 by connecting switch 1A to switch 1B.
The following figure shows the connection that is described in this step.
Figure 12 Connecting Remote Switches to Complete the Fabric Environment
12. Connection for the campus configuration is complete. Repeat step 4 through step
10 for any additional storage arrays that exist in the same cabinet that will use the
Synchronous Mirroring premium feature.
ATTENTION Possible hardware damage – DC-powered controller-drive trays and
drive trays have special power procedures that you must follow beyond the procedures
for AC-powered trays. To get specific power-off and power-on procedures, refer to the
topics under the storage array installation for the hardware that you are installing or to
the corresponding PDF document on the SANtricity ES Storage Manager Installation
DVD.
13. Turn on the power to all storage arrays, hosts, Fibre Channel switches, and any
other hardware at both sites where the power was turned off.
14. Hardware installation is complete. Refer to the online help topics for procedures
to configure the storage management software to support mirror relationships.
207