Unpacking And Inspection; Packing List; Power Supply Requirements - Applent Instruments Anbai AT2511 User Manual

Dc low resistance meter
Table of Contents

Advertisement

AT2511/511C User's Guide
6
Thank you for purchasing our product, please refer to this chapter before using the instrument.
This chapter describes how to set up and start the AT2511/511C DC Low Resistance Meter.

1.1 Packing List

following procedures.
Before using the instrument, please:
Table 1-1 Included Accessories
If there is damaged or shortage in accessories, please contact Applent Sales Department or retailer.

1.2 Power Supply Requirements

requirements:
To prevent electrical shock, please connect to GND.
If users change power cord, please make sure reliable connection of GND.

1. Unpacking and Inspection

Packing List
Power Supply Requirements
Setting up the Fuse
Environmental Requirements
Cleaning
After you receive the instrument, carry out checks during unpacking according to the
1.
Check that the packing box or shock-absorbing material used to package the
instrument has not been damaged.
2.
Referring to Table 1-1, check that all packaged items supplied with the meter have
been provided as per the specified optioned.
NAME
User's Manual
AC Power Cord
Fuse
ATL503 Kelvin Test Leads
Test Report
Product & Warranty Certification
Confirm that the power supplied to the AT2511/511C meets the following
Voltage:198-252V AC
Frequency:47.5-52.5Hz
Consumption:<15VA
QTY
REMARK
1
1
220V/50Hz
2
0.5A Slow-Blow
1
1
1

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Anbai AT2511 and is the answer not in the manual?

This manual is also suitable for:

Anbai at2511c

Table of Contents