Step
Instruction
23
Install the C-rails and clamps for
cable strain relief.
24
Fasten the PE busbar.
The PE busbar is provided for
grounding of the input cable
shield and the motor cable shield
if the PE terminal of the drive
module is not used.
25
Fasten shrouds over all live parts.

View of base plates and cable lead-throughs fastened

Input cable lead-throughs
Control cable
lead-throughs
Drive module of frame size R8
Motor cable lead-throughs