JLG 25RTS Service & Maintenance page 63

Hide thumbs Also See for 25RTS:
Table of Contents

Advertisement

AREA
PLATFORM
1. Controller
2. Switches
3. Placards and Decals
4. Control Tags
5. Hoses and Cables
6. Wear Pads
7. Handrails and Chains
CHASSIS
1. Engine Oil
2. Battery
3. Air Cleaner
4. Exhaust System
5. Engine Mounts
6. Hydraulic Pump
7. Valves
8. Hydraulic Filter (See Lubrication Chart)
9. Hydraulic Hoses and Tubing
10. Hydraulic Oil Tank*
11. Hydraulic Tank Breather
12. Fuel Tank
13. Lift Cylinder
14. Limit Switch
15. Tilt Alarm Switch
16. Placards and Decals
17. Wheel and Tire Assemblies
18. Drive Motors
19. Drive Brakes
20. Drive Torque Hubs
21. Steer Cylinder
22. Steer Components
23. Wheel Bearings (2 Wheel Drive)
24. Sizzor Arms
25. Safety Props
26. Sliding Wear Pads
27. Pivot Pins/Bolts
28. Switches, Ground Control
29. Control Tags
*Inspection and Maintenance Code 10 to be performed annually
3120826
Table 2-3. Preventive Maintenance and Safety Inspection
10Hours
50 Hours
(Daily)
(Weekly)
1,11
1,11
1,2
1,2
1,4
3
3
1
1
1
1
1
3
3,5
1,12
1,7
1,2
1
1
1
1,4
1,4
1,4
1,11
1,2
– JLG Sizzor –
INTERVAL
200 Hours
(Monthly)
4,8
8
5
5
14
1,5
1
5
5
5,14
14
5
5
4
6,14
4
5,6,13
4
8,9
1,5,6
1,6
8
1,3,5,6
5,6,13
4
4,6
8
8
8
7,8
SECTION 2 - PROCEDURES
500 Hours
1000 Hours
(3 Month)
(6 Month)
1,7
12
2-47

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

33rts40rts

Table of Contents