JLG 25RTS Service & Maintenance page 58

Hide thumbs Also See for 25RTS:
Table of Contents

Advertisement

SECTION 2 - PROCEDURES
NOTE: Be sure to use the same number of springs and
same spring pattern as recorded during disassem-
bly.
6. Position new large diameter return plate in housing
with tabs guided by dowel pins until disc rests on
springs.
NOTE: Discs and friction discs should remain dry during
installation. No oil residue should be allowed to con-
taminate disc surfaces.
7. Place a new friction disc on shaft until it contacts
return plate.
2-42
8. Add additional new discs and new friction discs as
required to complete assembly.
9. Insert separators in holes of return plate.
10. Install new o-ring, new back-up ring, new o-ring, and
new back-up ring on piston. Note order of o-rings
and back-up rings. Insert piston into end cover,
being careful not to shear o-rings or back-up rings.
– JLG Sizzor –
3120826

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

33rts40rts

Table of Contents