Installing The Profibus Master Unit; System Configuration Precautions; Mounting - Omron CJ Series Operation Manual

Master unit
Hide thumbs Also See for CJ Series:
Table of Contents

Advertisement

2 Nomenclature and Installation
2-2

Installing the PROFIBUS Master Unit

2-2-1

System Configuration Precautions

You can mount up to 16 Units on the CPU Rack or an Expansion Rack per CPU (but no more than 10
Units on one Rack).
2-2-2

Mounting

1
Carefully align the connectors to mount the PROFIBUS Master Unit.
2
Move the yellow sliders on the top and bottom of the Unit until they click into position, to lock.
2-6
CJ-series PROFIBUS Master Unit Operation Manual for NJ-series CPU Unit (W509)

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nj seriesProfibus cj1w-prm21

Table of Contents