4 PARALLEL CONFIGURATION WITH DIP SWITHES

Two units can be set in parallel with DIP-switches. This can be two identical MCU or MCP units. Provided that they use the
same DC voltage, this can also be one MCU and one MCP.
4.1

Materials needed

Description
Two units
Temperature sensor with cable and plug (included)
MasterBus Terminator (included but not always needed)
MasterBus cables between units (product code e.g. 3 meter: 77040300)
Sync cables to interconnect all units (product code e.g. 3 meter: 6502000030)
DC + cable with fuse
DC – cable
AC cable to connect the AC input of the unit to an external power source
AC cable to connect the external load to
AC cable to connect the external load to
4.2

Preparation

-
Make sure that all power sources (AC and DC) are switched off.
4.3

DC wiring of parallel units

Note: Always use the same length positive and negative cables! Be aware that to keep the drawings in this chapter clear and
easy to read, the cable lengths have not been drawn in proportion to each other.
DC cable cross
Power system
section
12V
95 mm
24V
50 mm
48V
35 mm
Mass Combi Ultra, Mass Combi Pro – Installation Manual Multiple Units
1
OUTPUT
2
OUTPUT
BUSBAR
FUSE
BATTERY
SWITCH
BATTERY BANK
Inline fuse
2
350 A
2
175 A
2
80 A
Parallel configuration with DIP switches
Quantity
2
1
1
2
2
2
2
2
FUSE
Recommended
battery bank
800 Ah
400 Ah
200 Ah
Indicated cable sizes are for cables from
unit to busbar and shorter than 3m. Cables
from busbar to battery bank should be
twice the diameter. When cables are
longer than 3m, the size should be
increased to compensate for cable losses.