Page 2
Key S2: Source Key S1: Menu Error LED Key S4: Select Key S3: Info LCD display Figure 0-1: overview of the Mastervolt Sunmaster XS 4300/ 3200/2000. CONTENTS: v 1.2 October 2011 GENERAL INFORMATION.............................. 4 Product description............................. 4 Use of this manual.............................. 4 Validity of this manual ............................
The warranty is limited to the costs of repair and/or photovoltaic modules. replacement of the product by Mastervolt only. Costs for Depending on the application and in order to meet the installation labour or shipping of the defective parts are not local applicable regulations, the Sunmaster can be covered by this warranty.
Use of the Sunmaster other than as mentioned under § 2.2 is not considered to be consistent with the intended purpose. Mastervolt is not liable for any damage resulting from the above. EN / Sunmaster XS4300-3200-2000 / October 2011...
Page 7
Install the Sunmaster in a sheltered environment. Mount the Sunmaster vertically, on a solid wall. Do not expose the Sunmaster to direct sunlight or other heat sources. EN / Sunmaster XS4300-3200-2000 / October 2011...
Page 8
Sunmaster. When installed next to 10 cm each other, keep at least 50 cm clearance. If this is not possible, take measures avoid inverter heating up the other. > 50 cm 10 cm >10 cm >10 cm October 2011 / Sunmaster XS4300-3200-2000 / EN...
For example international standard IEC60364-7-712 prescribes a DC switch in solar electric installations in buildings. For this reason Mastervolt offers several models of the Sunmaster with integrated DC-switch. See chapter 3.2 to check if your Sunmaster is equipped with such a DC-switch.
Solar-input should exist of an equal number of identical PV-modules. See figure 3-4. String 1 String 2 String 1 + 2 String 3 + 4 MultiContact Y-adapters AC grid Figure 3-2 Figure 3-4 AC grid Figure 3-3: Y-adapter October 2011 / Sunmaster XS4300-3200-2000 / EN...
• RS485 communication cables. • Follow steps installation instructions in order of succession as described. • The DC switch, if installed, must stay in OFF-position during entire installation. EN / Sunmaster XS4300-3200-2000 / October 2011...
Place the Sunmaster over the mounting the wiring to the screw terminals. bracket and then move it downwards until it is locked by the mounting bracket. Figure 4-3 Figure 4-6 October 2011 / Sunmaster XS4300-3200-2000 / EN...
If connection has been made correctly and solar irradiation is sufficient, the Sunmaster will switch on automatically. This may take a few seconds. At first commissioning the country code must be Figure 4-8 selected. See section 4.3.2. EN / Sunmaster XS4300-3200-2000 / October 2011...
Remove the bottom plate of the Sunmaster and Press S2 to select the disconnect the AC wiring. displayed country code Now the Sunmaster can be demounted in a safe way. Press S4 to scroll through the country codes October 2011 / Sunmaster XS4300-3200-2000 / EN...
This is a normal effect which has a positive contribution to the efficiency and lifetime of the Sunmaster. LCD Display S1: Menu S2: Source Error LED S3: Info S4: Select Figure 5-1: Operation of the LCD-display EN / Sunmaster XS4300-3200-2000 / October 2011...
AC grid PV-string AC grid frequency Ω AC grid impedance* °C Internal temperature of Internal temperature of the inverter the inverter Energy generated today * ENS-models only (see chapter 3.2), else 0.00 is shown. October 2011 / Sunmaster XS4300-3200-2000 / EN...
One day back in the past. displayed. Press and hold Scrolling days forward. This value represents the total operating hours of the selected input. Examples: Shows today’s data Shows yesterday’s data Shows data from one week ago EN / Sunmaster XS4300-3200-2000 / October 2011...
Isolation detection On/Off 3 PH block On/ Off (see section 5.3.8). For settings, press S1 and S2 for 5 seconds. S3 and S4 enable scrolling through the settings, S2 confirms the setting you selected. October 2011 / Sunmaster XS4300-3200-2000 / EN...
Sunmaster. Never use any liquids, acids and/or scourers. Figure 5-8 shows the display sequence when the first phase fails and starts up again. Inverter 1 Inverter 2 Inverter 3 Figure 5-8: 3 Phase Block function EN / Sunmaster XS4300-3200-2000 / October 2011...
Sunmaster replacement of the Sunmaster. Fast blinking EF I2C FAIL Fast blinking ENS FAIL Fast blinking CB I2C FAIL Fast blinking HW VAC FAC Fast blinking HW RELAY Fast blinking HW ERROR 1-9 October 2011 / Sunmaster XS4300-3200-2000 / EN...
PG-13.5 gland and screw PG-13.5 gland and screw terminals 2.5 - 4 mm2 terminals 2.5 - 4 mm2 terminals 2.5 - 4 mm2 * Depending on country settings, see section 4.3.2 ** Belgian version max 3330W EN / Sunmaster XS4300-3200-2000 / October 2011...
Page 22
SAFETY DEVICES General Galvanic separation between DC and AC side, by means of a class II transformer Island protection* Mastervolt Digital ENS - VDE 0126 -1-1 compliant Reclosure time* 10-300 sec Temperature protection Power derating above 75°C internal temperature, switch off at 90°C DC side Earth fault (switch off);...
Delivery includes: 100 meter modular cable, 100 pcs. modular jacks and crimping tool Mastervolt can offer a wide range of products for both grid connected and independent autonomous electrical installations, See our website www.mastervolt.com for an extensive overview of all our products.
Automatically after test operation. The test accuracy is better than 1V/ 0.1Hz if ACTUAL DAY TOTAL SYSTEM grid voltage and frequency are stable. Menu FL-test Blinking ASTERVOLT Automatically after test Figure 9-1 Actual EN / Sunmaster XS4300-3200-2000 / October 2011...
Page 26
ASTERVOLT Calculation by hand: UT = UG – (TIME * 11.5). FH-test Example: if UG = 230V and TIME = 4.00 s, Figure 9-3 UT = 230 - (4.00*11.5) = 184V. October 2011 / Sunmaster XS4300-3200-2000 / EN...
Page 27
Calculation by hand: FT = FG – (TIME * 0.05). Actual Example: if FG = 50.00 Hz and TIME = 6.00 s, Figure 9-5 the result is 50.00 - (6.00*0.05) = 49.70 Hz. EN / Sunmaster XS4300-3200-2000 / October 2011...
EN 61000-4-11 and -3-3 Immunity EN 55024 EN 61000-4-2 and -3 EN 61000-4-4, -4-5 and -4-6 LV directive 2006/95/EC Electrical safety EN 60950-1 Amsterdam, 18-10-2011 MASTERVOLT INTERNATIONAL B.V. Ing. D.R. Bassie Product Manager Solar EN / Sunmaster XS4300-3200-2000 / October 2011...
Page 30
08 00 0 43 8978 Guaranteed Low Prices þ Huge Stock Available þ or 0121 250 2180 Mastervolt Stockist þ Mon-Fri: 8:30am - 6:30pm | Sat & Sun: 11am - 5pm CERTIFICATES AS4777 CERTIFICATE OF COMPLIANCE 10.3 October 2011 / Sunmaster XS4300-3200-2000 / EN...
Page 31
Mastervolt Stockist þ Mon-Fri: 8:30am - 6:30pm | Sat & Sun: 11am - 5pm CERTIFICATES Snijdersbergweg 93, 1105 AN Amsterdam, The Netherlands Tel : + 31-20-3422100 Fax : + 31-20-6971006 Email : info@mastervolt.com EN / Sunmaster XS4300-3200-2000 / October 2011...