INSTRUCTION MANUAL
Model:
Serial Number :
• INSTALLATION • OPERATION • MAINTENANCE
From 20 - 180 Tons
Air & Water Cooled
with MG Control Instrument
ADVANTAGE ENGINEERING, INC.
525 East Stop 18 Road Greenwood, IN 46142
317-887-0729 fax: 317-881-1277
Service Department fax: 317-885-8683
www.AdvantageEngineering.com
E-mail service@AdvantageEngineering.com
Covering Models

Advertisement

Table of Contents
loading

Summary of Contents for Advantage Engineering Titan

  • Page 1 • INSTALLATION • OPERATION • MAINTENANCE Covering Models From 20 - 180 Tons Air & Water Cooled with MG Control Instrument ADVANTAGE ENGINEERING, INC. 525 East Stop 18 Road Greenwood, IN 46142 317-887-0729 fax: 317-881-1277 Model: Service Department fax: 317-885-8683 www.AdvantageEngineering.com...
  • Page 3 INSTRUCTION MANUAL AIR & WATER COOLED MODELS MG Control Instrument With COVERING INSTALLATION OPERATION MAINTENANCE ADVANTAGE ENGINEERING, INC. 525 East Stop 18 Road Greenwood, IN 46142 317-887-0729 fax: 317-881-1277 Service Department fax: 317-885-8683 Website: www.AdvantageEngineering.com E-mail: service@AdvantageEngineering.com...
  • Page 4: Table Of Contents

    Titan Central Chillers TABLE OF CONTENTS GENERAL Introduction Safety Receiving instructions 1.4 Efficiency Clean air act Water Treatment Model Designation Components INSTALLATION General Unit Location Chilled Water Piping Installation Water-Cooled Condenser (TI-W Models) Air-Cooled Condenser (TI-A Models) Make-Up Water Supply Connection...
  • Page 5 Titan Central Chillers MAINTENANCE Warranty Service Procedure Periodic Preventative Maintenance Special Maintenance Solenoid Valve Service Pump Seal Service Checking Refrigerant Charge Proper Cleaning Procedure for Brazed Plate Evaporators COMPONENTS Refrigeration Components Coolant System RELATED DRAWINGS Titan Circuit Drawing Typical Press Drop...
  • Page 6 THIS PAGE INTENTIONALLY BLANK Page: 6...
  • Page 7: General

    Titan Central Chillers GENERAL Introduction Safety Receiving Instructions 1.4 Efficiency Clean Air Act Water treatment Model Designation Components ADVANTAGE ENGINEERING, INC. Page: 7 525 East Stop 18 Road Greenwood, Indiana 46142 317-887-0729 Fax: 317-881-1277 Service Department Fax: 317-885-8683 Email: service@AdvantageEngineering.com...
  • Page 8: Introduction

    Titan Central Chillers INTRODUCTION This manual covers Titan central chillers from 20 to 180 tons (70 to 633 kW) of cooling capacity using the Advantage MG microprocessor control instrument and fixed displacement scroll compressors and digital scroll compressors. The standard fluid operating temperature range for this chiller is 20°F to 80°F for units using R410A refrigerant. Units using other refrigerants have different standard operating ranges. Units operating below 48°F fluid require the use of a water/propylene glycol to prevent freezing.
  • Page 9 Titan Central Chillers WARNING: This equipment contains hazardous voltages that can cause severe injury or death. Disconnect and lock out incoming power before installing or servicing the equipment. WARNING: This equipment contains refrigerant under pressure. Accidental release of refrigerant under pressure can cause personal injury and or property damage. Exercise care while working on or around this equipment.
  • Page 10: Receiving Instructions

    Titan Central Chillers RECEIVING INSTRUCTIONS Chillers are shipped skid mounted and wrapped in plastic prior to shipment. Check the overall condition of the equipment prior to accepting delivery. Check for visible damage and document any evident damage on the delivery receipt.
  • Page 11: Water Treatment

    Titan Central Chillers WATER TREATMENT WARNING: Improper water treatment will void unit warranty. The use of untreated or improperly treated water in a portable chiller may result in scaling, erosion, corrosion, algae or slime. It is recommended that the services of a qualified water treatment specialist be engaged to determine what water treatment is required.
  • Page 12: Components

    Titan Central Chillers COMPONENTS Titan TI-60W shown A - Water cooled condensers B - Pump suction valve handles C - Alarm D - Gauge panel E - Compressors F - Fluid reservoir G - Evaporator pump H - Operator control panel...
  • Page 13: Installation

    Titan Central Chillers INSTALLATION General Unit Location Chilled Water Piping Installation Water-Cooled Condenser (TI-W Models) Air-Cooled Condenser (TI-A Models) Make-Up Water Supply Connection Electrical Connection Air-Cooled Condenser Installation (Typical) Water-Cooled Condenser Installation (Typical) ADVANTAGE ENGINEERING, INC. Page: 13 525 East Stop 18 Road Greenwood, Indiana 46142...
  • Page 14: Chilled Water Piping Installation

    Titan Central Chillers GENERAL Chillers are shipped skid mounted and wrapped in plastic prior to shipment. Check the overall condition of the equipment prior to accepting delivery. Check for visible damage and document any evident damage on the delivery receipt. Shipping damage is the responsibility of the carrier.
  • Page 15: Water-Cooled Condenser (Ti-W Models)

    Titan Central Chillers FROM PROCESS : a rigid pipe should be connected to the return From Process process header and dropped through the circular opening in the This label marks the From reservoir lid on the ‘hot’ side of the reservoir. The return water pipe Process connection must extend below the surface of the tank water during operation (approx. 1.5’ above the bottom of the tank to prevent unwanted...
  • Page 16: Air-Cooled Condenser (Ti-A Models)

    Titan Central Chillers Typical Water-Cooled Condenser Connections Condenser From Process To Process Water In This label marks the Condenser Water In connection Condenser Condenser From Process To Process Water Out Water In This label marks the Condenser Water Out connection TI-60W shown with optional standby pump and manifold.
  • Page 17 Titan Central Chillers Typical refrigerant connections for remote air-cooled condenser Zone 1 Typical refrigerant connections for remote air-cooled condenser Zone 2 TI-60A shown with optional variable speed drive. Installation instructions are provided by the manufacturer of the condensing unit and are shipped in the electrical cabinet.
  • Page 18: Make-Up Water Supply Connection

    Titan Central Chillers vapor migration from accumulating on compressor heads during off cycle. Condenser refrigeration piping sized by refrigeration contractor based on specific installation. For piping lengths greater than 50 ft provide support to liquid and gas lines near the connections to the coil. SEE NOTE #1 HOT GAS LINES...
  • Page 19: Electrical Connection

    Titan Central Chillers WARNING: Check local codes to determine proper use of back flow prevention device in water make-up supply line. Typical location of Water Supply connection. ELECTRICAL CONNECTION STANDARD MODELS All electrical wiring must comply with local codes and the National Electric Code.
  • Page 20 Titan Central Chillers WARNING: Do not connect the unit to a voltage supply not equal to the unit’s voltage requirements as specified on the unit’s data plate. Use of incorrect voltage will void the unit’s warranty and cause a significant hazard that may result in serious personal injury and unit damage.
  • Page 21 Titan Central Chillers WARNING: Check that all electrical connections are tight before starting. Disconnect power before servicing. Follow all facility lock-out tag-out procedures. Alarm Beacon Refrigerant and Coolant Pres- sure Gauges 3 Phase Monitor (optional) Zone Boards Transformer Power Entry...
  • Page 22: Air-Cooled Piping Installation (Typical)

    Titan Central Chillers Air-Cooled piping installation (typical) Chiller (air-condensed, 2 pump system with standby pump) Water make-up connection (chiller reservoir) From city water supply (reservoir make up) Overflow connection (chiller reservoir) Pump discharge connection (supply to process) Condenser (Zone #1, remote outdoor unit, mounted at ground level on concrete pad or on roof)
  • Page 23: Water-Cooled Piping Installation (Typical)

    Titan Central Chillers WATER-COOLED PIPING INSTALLATION (TYPICAL) This drawing is supplied to demonstrate a possible piping configuration for the equipment and is general in nature showing pipe sizes and basic routing. It is not intended to be inclusive of every detail required for specific location and installation. Consult with a professional engineer to determine specific needs before installation.
  • Page 24 THIS PAGE INTENTIONALLY BLANK Page: 24...
  • Page 25: Operations

    Titan Central Chillers OPERATIONS General Start Up / Operations Procedure Operator Controls MG Instrument Operation Instrument : Main Menu Instrument : Setpoints Menu Instrument : Utilities Menu Instrument : Network Menu Instrument : Flow Menu (optional) 3.10 Instrument : Options Menu 3.11...
  • Page 26: General

    Titan Central Chillers WARNING: Follow all Factory operations procedures. Failure to do so may create a hazardous operating condition which may result in serious operator injury and/or unit damage. GENERAL Failure to follow the factory required operations procedure may adversely affect the unit’s ability to adequately control process temperature and may create a hazardous operating condition which may result in serious operator injury and/or unit damage.
  • Page 27 Titan Central Chillers and the water supply will fill the reservoir tank. Do not use automatic fill when operating at temperature below 48°F. MANUAL FILL: Add fluid directly to the reservoir. When the pump is first started, as process lines are filled and air is purged, additional fluid may be required to restore the reservoir to the correct level. Verify reservoir level via the coolant sight glass. Do not use deionized water in this unit unless your unit was specifically designed for use with deionized water. Consult factory if not certain.
  • Page 28 Titan Central Chillers After electrical installation the rotation must be checked by observing the pump motor shaft on the end of the pump and comparing its rotation to the directional arrow on the motor. If the rotation needs to be changed it should be done at the main power entry by switching any two power conductors at the terminal block or customer supplied main power disconnect.
  • Page 29 Titan Central Chillers Incorrect rotation is “counter-clockwise” (incorrect phase) when viewed from the rear of the motor. If the shaft does not rotate when the ON/OFF SWITCH is on, the operator must identify the cause as outlined in the troubleshooting and repair section of this manual. If the motor shaft is phased correctly (shaft turns in a clockwise direction), continue with step C.
  • Page 30 Titan Central Chillers electric motor. The following example is the start up procedure for a two pump central chiller. Fully open the suction valves to the pumps allowing the pump case to fill with water. Never allow the pump to operate dry, this can cause shaft seal failure. Discharge Valve Suction Valve 2. Close the discharge valves. A centrifugal pump can be operated with no flow without damage, although this should not be for an extended period of time.
  • Page 31: Operator Controls

    Titan Central Chillers If during operations the motor overload trips, the overloads will need to be manually reset to restart operations. Once the pump is restarted, check for excessive motor amps at the motor starter block and throttle back the pump’s discharge valve as required. OPERATOR CONTROLS Depending on the unit’s standard and option configuration, the number of switches and buttons maybe different than shown below. A typical configuration is shown here.
  • Page 32 Titan Central Chillers Titan Central Chillers Pressure Gauges Pump Valves Process Pump Standby Pump Evaporator Pump Operator Controls MG Control Instrument ADVANTAGE ENGINEERING, INC. Page: 32 525 East Stop 18 Road Greenwood, Indiana 46142 317-887-0729 Fax: 317-881-1277 Service Department Fax: 317-885-8683...
  • Page 33: Mg Instrument Operation

    Titan Central Chillers Titan Central Chillers MG INSTRUMENT OPERATION MG Series Control. This control instrument is used on units with fixed displacement compressors. INSTRUMENT START-UP When the correct electrical power and adequate water supply pressure are supplied to the unit, it is possible to start the unit. Upon powered up, the instrument displays the Standby Screen.
  • Page 34 Titan Central Chillers PRECAUTIONS: The chiller control is programmed from the factory with a setpoint range of 48° to 70°F. To operate below 48°F, the addition of inhibited propylene glycol and modification of the limit control settings are required. These adjustments are done from the chiller controller screen. Diligent monitoring of the water/glycol solution is mandatory to prevent freezing of the evaporator.
  • Page 35 Titan Central Chillers To Process To Process To Process 50°F 50°F 50°F S e t p o i n t : 50°F S e t p o i n t : 50°F S e t p o i n t : 50°F...
  • Page 36: Instrument : Main Menu

    Titan Central Chillers Process temperature is above the Setpoint. The instrument will engage the capacity control system (digital unloading or hot gas bypass) when the To Process temperature is below the Setpoint by no more than 3 degrees. Units equipped with a digital scroll compressor (includes a “D” in the model number such as MGD-10A) will operate in the unloaded state for a maximum of 50 seconds out of every 60 seconds.
  • Page 37 Titan Central Chillers To Process Main Menu To Process Setpoints 50°F 50°F Setpoints Process Setpoint Utilities Hi Deviation Network Lo Deviation Flow Low Flow Options S e t p o i n t : 50°F S e t p o i n t : 50°F...
  • Page 38: Instrument : Utilities Menu

    Titan Central Chillers For example, if the flow set value is 3 GPM and if the flow goes below 3 GPM an alarm condition is indicated. Note: the low flow alarm feature is only available with the purchase of the optional flow meter. Setpoints To Process Low Flow To Process To Process Change Setting 50°F 50°F 50°F Process Setpoint 3 GPM Low Flow Hi Deviation Success Lo Deviation Low Flow S e t p o i n t : 50°F S e t p o i n t : 50°F...
  • Page 39: Instrument : Network Menu

    Titan Central Chillers The test will show a blank screen. If any bad pixels or sectors are detected, those pixels or sectors will be dark. If dark pixels or sectors are indicated, contact the factory repair or replacement options. Sensor Display. There are up to 11 sensors the controller monitors.
  • Page 40 Titan Central Chillers To Process To Process To Process Network Protocol Change Setting 50°F 50°F 50°F Protocol Protocol SPI CCP Baud Rate Success Modbus RTU Address CAMAC S e t p o i n t : 50°F S e t p o i n t : 50°F S e t p o i n t : 50°F...
  • Page 41: Instrument : Flow Menu (Option)

    Titan Central Chillers INSTRUMENT : FLOW MENU (Option) The Flow Menu is only functional when the optional flow meter is installed. Items in the Flow Menu are Enable, Offset and Calibration. Main Menu To Process To Process Main Menu To Process FLow 50°F 50°F 50°F Setpoints Setpoints Enable Utilities Utilities Offset Network Network Calibration Flow...
  • Page 42: Instrument : Options Menu

    Titan Central Chillers 3.10 INSTRUMENT : OPTIONS MENU The single selection under the Options menu is the Remote Start. To Process To Process To Process Main Menu Main Menu Options 50°F 50°F 50°F Setpoints Setpoints Remote Start Utilities Utilities Network...
  • Page 43 Titan Central Chillers Back Buttons to advance between Month, Day and Year. Set Time. To Process Main Menu To Process Machine Set Time 50°F 50°F Setpoints Set Date Utilities Set Time : 42 : 42 Network Min Setpoint Flow Hi Temp Shutdown Options S e t p o i n t : 50°F...
  • Page 44 Titan Central Chillers Hi Temp Shutdown. This shuts down the unit if process temperature exceeds the selected value to prevent excessively warm fluid temperature. To Process FLow Machine Hi Temp Shutdown Change Setting 50°F Enable Set Date Hi Temp Shutdown 100°F Offset Set Time Success Calibration Min Setpoint...
  • Page 45: Controls

    Titan Central Chillers 3.12 CONTROLS Flow switch: Installed on each evaporator water circuit. Its mission is to monitor the fluid flow and to shut down the compressor in case a harmful low flow condition should develop. Freezestat: Factory adjusted to turn off the compressor in the event an unsafe temperature should exist from the evaporator. This switch should be periodically checked for proper operation.
  • Page 46 Titan Central Chillers The alarm pressure switch functions to energize the alarm if coolant pressure is denied the process. Level Switch Most models include a level switch that monitors the tank fluid level and provides a warning when the tank level is low and needs to be refilled. The chiller will start up the pump when a low level Typical Water Level Switch condition exists.
  • Page 47: Pressure Gauges & Alarms

    Titan Central Chillers Oil pressure safety switch de-energizes the compressor if oil pressure in the compressor is not adequate. Refer to the troubleshooting guide for common reasons for this failure. (Provided on certain models.) The alarm pressure switch functions to energize the alarm if coolant pressure is denied the process.
  • Page 48: Digital Pressurestat Set Up

    Titan Central Chillers 3.14 DIGITAL PRESSURESTAT SET UP Some models of this central chiller provide optional digital pressurestats for refrigerant high and low pressure monitoring and display in lieu of traditional analog gauges. The digital refrigerant pressurestat is a dual pressure safety switch as well as a current value refrigerant pressure display that uses transducers with a 0-10v output an in input source.
  • Page 49 Titan Central Chillers To change set point values : RESET TRIP On Initial Start-up press the Reset button to clear any errors. POWER ON Press and release the Toggle HEAD HEAD SUCTION SUCTION Display button once. You will see PRESSURE...
  • Page 50 THIS PAGE INTENTIONALLY BLANK Page: 50...
  • Page 51: Troubleshooting

    Titan Central Chillers TROUBLESHOOTING Unit Will Not Start Compressor Hums But Will Not Start Shuts Off On High Pressure Shuts Off On Low Pressure Compressor Shuts Off on Internal Overload Low or No Process Pressure or Water Flow Cooling Capacity Inadequate...
  • Page 52: Unit Will Not Start

    Titan Central Chillers WARNING: Before troubleshooting or servicing this unit, follow all company lock-out tag-out procedures. UNIT WILL NOT START Power off. Check main disconnect. Main line open. Check fuses. Loose terminals. Tighten terminals with POWER OFF. Control circuit open. Check control voltage fuses and transformer.
  • Page 53: Shuts Off On Low Pressure

    Titan Central Chillers Water-cooled units: Water regulator valve. Adjust condenser water regulator valve to maintain * See Temperature-Pressure 100°F to 105°F refrigerant condensing temperature*. If valve is defective, have chart in Section 8.2 for refrigerant pressure. valve repaired or replaced by a refrigeration serviceman.
  • Page 54: Compressor Shuts Off On Internal Overload

    Titan Central Chillers Water-cooled units: Head pressure too low. Adjust condenser water regulating valve to maintain * See Temperature-Pressure chart in Section 8.2 for 100°F - 105°F refrigerant condensing temperature*. Have a refrigeration refrigerant pressure. serviceman repair the valve or replace if defective.
  • Page 55: Cooling Capacity Inadequate

    Titan Central Chillers COOLING CAPACITY INADEQUATE Low refrigerant charge. Check for adequate refrigerant charge (bubbles or misty sight glass indicates low charge). If charge is low, have system checked for leaks and recharged by a refrigeration serviceman. Hot-gas bypass valve stuck open. Have repaired or replace if defective by a refrigeration serviceman.
  • Page 56: Crankcase Heater

    Titan Central Chillers 4.11 CRANKCASE HEATER (not on all models) If the crankcase heater is not drawing current during the compressor off cycle, check for a defective crankcase heater, defective fuses or defective interlock on the compressor starter. Scroll compressors do not have crankcase heaters.
  • Page 57 Titan Central Chillers OTHER INFORMATION Repair Warranty: 1 year. Ship to: Advantage Engineering 525 East Stop 18 Road Greenwood, IN 46143 Attention: Repairs. (317-887-0729) Include in box: part, purchase order, contact name, phone number, symptom (if available). For Priority Service, send the instrument to us via overnight shipment. We usually repair these instruments the same day we receive them! ADVANTAGE ENGINEERING, INC.
  • Page 58 THIS PAGE INTENTIONALLY BLANK Page: 58...
  • Page 59: Maintenance

    Titan Central Chillers MAINTENANCE Warranty Service Procedure Periodic Preventive Maintenance Special Maintenance Solenoid Valve Service Pump Seal Service Checking the Refrigerant Charge Proper Cleaning Procedure for Brazed Plate Evaporator ADVANTAGE ENGINEERING, INC. Page: 59 525 East Stop 18 Road Greenwood, Indiana 46142...
  • Page 60: Warranty Service Procedure

    Titan Central Chillers WARRANTY SERVICE PROCEDURE In the event of a problem with a chiller that can not be resolved by normal troubleshooting procedures, the customer is invited to consult the Service Department for assistance. The correct model number and serial number of the chiller must be available. The service department will attempt to isolate the problem and advise repair procedures.
  • Page 61: Special Maintenance

    Titan Central Chillers SPECIAL MAINTENANCE Any service of the refrigeration system must be accomplished by a certified refrigeration technician. Addition of compressor oil. Addition of refrigerant. Repair of a refrigerant leak. Adjustment of super heat. Changing of filter-drier or drier core. Repair of a refrigeration solenoid. ADVANTAGE ENGINEERING, INC. Page: 61 525 East Stop 18 Road Greenwood, Indiana 46142...
  • Page 62: Solenoid Valve Service

    Titan Central Chillers AUTOMATIC WATER MAKE-UP SYSTEM SERVICE The automatic water make-up system consists of a level switch (figure 5.4A) and a solenoid valve (figure 5.4B). When the tank level is low the level switch signals the solenoid valve to open allowing make-up water to re-fill the tank. Level switch maintenance and service. The level switch contacts engage and disengage the water make-up solenoid valve. Poor water quality can allow debris or a film build- up on the level switch contacts which can impair Typical water make-up Figure 5.4A...
  • Page 63 Titan Central Chillers Clean all components as required. Coil and solenoid base sub assembly Valve body Core spring Core Body Diaphragm Diaphragm assembly assembly Gasket spring ADVANTAGE ENGINEERING, INC. Page: 63 525 East Stop 18 Road Greenwood, Indiana 46142 317-887-0729...
  • Page 64: Pump Seal Service

    Titan Central Chillers PUMP SEAL SERVICE Rotating Member Tension Spring The coolant pump seal is a carbon/niresist shaft seal assembly including a stationary member, rotating member and tension spring (figure 5.5A). The operator can determine the pump seal is leaking when fluid is identified leaking from the pump case adapter. Generally, a...
  • Page 65 Titan Central Chillers Separate the motor and motor adapter from the pump casing to expose the pump impeller (figure 5.5E). Remove the motor and motor adapter from the unit and place on a workbench to continue the procedure. Locate and remove the dust cap from motor end to expose slotted motor shaft.
  • Page 66 Titan Central Chillers Clean pump casing, cavities, impeller and O-ring before reassembly. Mate the motor and motor adapter to the pump casing. Reinstall the pump casing bolts. Reconnect the motor power cord and leads. Restore all cover panels as were removed.
  • Page 67: Checking Refrigerant Charge

    Titan Central Chillers CHECKING THE REFRIGERANT CHARGE All standard chillers are manufactured with thermostatic expansion valves as the metering device to the evaporator. All standard chillers have a refrigerant sight glass with a moisture indicator. To check the refrigerant charge under normal operating conditions: Remove the plastic cap covering the sight glass.
  • Page 68 Titan Central Chillers unit. Connect a water supply hose to the evaporator water outlet. If acid cleaning, connect the discharge hose from the acid pump to the evaporator outlet port. Connect a hose to the evaporator water supply port and to an appropriate containment vessel.
  • Page 69: Components

    Titan Central Chillers COMPONENTS Refrigeration System Coolant System ADVANTAGE ENGINEERING, INC. Page: 69 525 East Stop 18 Road Greenwood, Indiana 46142 317-887-0729 Fax: 317-881-1277 Service Department Fax: 317-885-8683 Email: service@AdvantageEngineering.com...
  • Page 70: Refrigeration Components

    The air-cooled Compressors. Configuration may be condenser is located outdoors on most Titan central different on specific units chillers. Models using air-cooled condensers are designated with a TI-A in the model number. WATER-COOLED CONDENSER: The water cooled condenser removes BTU’s from the...
  • Page 71 Titan Central Chillers Brazed Plate Evaporator Expansion Valve Refrigerant Sight Glass Liquid Line Solenoid Valve HOT GAS BY-PASS SOLENOID: The hot gas by-pass solenoid prevents short cycling of the compressor by reducing the capacity by 50% when the process fluid temperature nears the setpoint. HIGH/LOW PRESSURESTATS: the high/low pressurestats protect the refrigeration system from unsafe operating levels.
  • Page 72: Coolant System

    Titan Central Chillers Service valves: Have been provided throughout the system. Only a qualified refrigeration service technician shall operate these valves. Crankcase heater: Insures that freon and compressor crankcase oil do not mix during the compressor’s “off ” cycles. Power must be applied to the chiller previous to startup. (Not on all models.) Oil pressure safety switch: protects the compressor from lubrication failure. (Not on all models.)
  • Page 73 Titan Central Chillers Condenser Connections (Water-Cooled Models) Reservoir Water Make-Up Valve Reservoir Sight Glass Process Pump Standby Pump Evaporator Pump Reservoir Level Switch ADVANTAGE ENGINEERING, INC. Page: 73 525 East Stop 18 Road Greenwood, Indiana 46142 317-887-0729 Fax: 317-881-1277 Service Department Fax: 317-885-8683...
  • Page 74 THIS PAGE INTENTIONALLY BLANK Page: 74...
  • Page 75: Related Drawings

    Titan Central Chillers RELATED DRAWINGS Circuit Drawing Typical Press Drop Typical Vacuum Breaker / Anti-Siphon System ADVANTAGE ENGINEERING, INC. Page: 75 525 East Stop 18 Road Greenwood, Indiana 46142 317-887-0729 Fax: 317-881-1277 Service Department Fax: 317-885-8683 Email: service@AdvantageEngineering.com...
  • Page 76: Titan Circuit Drawing

    Titan Central Chillers TITAN CIRCUIT DRAWING (WATER-COOLED MODELS) Item Item Item From process connection Process pump High pressure safety switch Tank assembly Supply pressure gauge Compressor discharge valve Baffle plate Alarm pressure switch Condenser Tank drain valve To process connection Service valve...
  • Page 77: Typical Press Drop

    Titan Central Chillers TYPICAL PRESS DROP TOWER WATER TO PROCESS TOWER WATER FROM PROCESS CHILLED WATER TO PROCESS CHILLED WATER FROM PROCESS TOWER WATER TO PROCESS CHILLED WATER TO PROCESS TOWER WATER FROM PROCESS CHILLED WATER FROM PROCESS THERMOMETERS AND PRESSURE GAUGES ON "TO"...
  • Page 78: Typical Vacuum Breaker / Anti-Siphon System

    Titan Central Chillers TYPICAL VACUUM BREAKER / ANTI-SIPHON SYSTEM INSTALLATION NOTES: The purpose of the vacuum breaker/anti-siphon (also called a drain-back dam), is to retain water in the header system during shut-down, and to eliminate air purge and shock to plumbing during start-up.
  • Page 79: Appendix

    Titan Central Chillers APPENDIX Operations Below 48F Inhibited Propylene Glycol Refrigerant Pressure - Temperature Chart Chiller Capacity and Derate Chart ADVANTAGE ENGINEERING, INC. Page: 79 525 East Stop 18 Road Greenwood, Indiana 46142 317-887-0729 Fax: 317-881-1277 Service Department Fax: 317-885-8683...
  • Page 80: Operations Below 48°F Fluid Or 38°F Ambient

    Titan Central Chillers OPERATIONS BELOW 48°F FLUID OR 38°F AMBIENT The chiller is never to be operated below 48°F leaving water temperature without several precautionary measures. All controls are factory adjusted for 48°F and above operations. Before readjusting the protective devices, a satisfactory antifreeze solution must be substituted for the recirculating chilled water.
  • Page 81 Titan Central Chillers WARNING: Never lower the cut out setting on the adjustable low pressure switch without adding glycol to the circulating system. Evaporator damage will result and this damage is not covered by the factory warranty. Fixed low pressure switch Fixed Low Pressure Switch If your unit is equipped with a non-adjustable “fixed” pressure switch with a...
  • Page 82 Titan Central Chillers instrument section of this manual or call the Advantage service department for specific instructions. LE Instruments. Adjust the DIP switch to accommodate the expanded temperature range. Contact the factory for more information. Multizone Instruments. Adjust the DIP switch to accommodate the expanded temperature range. Contact the factory for more information.
  • Page 83: Refrigerant Pressure-Temperature Chart

    Titan Central Chillers REFRIGERANT PRESSURE-TEMPERATURE CHART ADVANTAGE ENGINEERING, INC. Page: 83 525 East Stop 18 Road Greenwood, Indiana 46142 317-887-0729 Fax: 317-881-1277 Service Department Fax: 317-885-8683 Email: service@AdvantageEngineering.com...
  • Page 84: Inhibited Propylene Glycol

    Titan Central Chillers INHIBITED PROPYLENE GLYCOL To operate liquid chillers below 48°F, it is necessary to add inhibited propylene glycol to the circulating system to lower the freeze point and prevent damage to the cooling system. Inhibited propylene glycol contains corrosion inhibitors which are compatible with most industrial heat transfer surfaces.
  • Page 85: Standard Mg Instrument Settings

    Titan Central Chillers STANDARD MG INSTRUMENT SETTINGS Caution: See section 8.1 for proper settings based on your fluid set point temperature. Adjustable Low Pressure Cut Out Range • 9 PSI to 150 PSI Adjustable Low Pressure Cut In Range • 19 PSI to 150 PSI Adjustable High Pressure Cut Out Range • 225 PSI to 580 PSI ADVANTAGE ENGINEERING, INC.
  • Page 86: Probe Calibration : Mg Instrument

    Titan Central Chillers PROBE CALIBRATION : MG Instrument Equipment Needed: Potentiometer adjustment tool / flat-blade screw driver (tip width of 0.050” or less works best Temperature reference (ice water bath) 1/2” plug Digital thermometer Screwdriver (chassis disassembly) Setup: Disengage process operations according to the procedure outlined in the unit manual. The operator must be certain all system pressure is relieved and unit pressure gauges read “0”.
  • Page 87 Titan Central Chillers If calibration of this probe is required, repeat the setup and calibration procedure with the “from process” probe. A from process probe may not be included with your chiller. Stop the unit following the shutdown procedure described in the manual and place all process probes back in the unit to return to normal operation.
  • Page 88: Status Indicators : Mg Instrument

    Titan Central Chillers STATUS INDICATORS : MG INSTRUMENT The control instrument is configured at the Factory for the type and number of compressors and type of capacity unloading mechanism. Shown below are possible Status Indicators displays for various compressor and capacity unloading set ups. S e t p o i n t : 50°F...
  • Page 89: Water Quality

    Titan Central Chillers WATER QUALITY Lack of as well as improper water treatment can damage to your equipment. The equipment owner is responsible to prevent equipment damage from foreign material or inadequate water treatment. The services of a competent water treatment specialist...
  • Page 90 Titan Central Chillers Algae Algae (organism growth) can be controlled by the proper use of chemical treatment. ADVANTAGE ENGINEERING, INC. Page: 90 525 East Stop 18 Road Greenwood, Indiana 46142 317-887-0729 Fax: 317-881-1277 Service Department Fax: 317-885-8683 Email: service@AdvantageEngineering.com...
  • Page 91: Modbus Registers

    Titan Central Chillers MODBUS REGISTERS Register Coil Range Units Notes * Low water level is defined but not implemented and will never trigger Temperature Setpoint 0 - 250 Reserved Temperature High Alarm 0 - 50 Deviation Value Temperature Low Alarm...
  • Page 92: Remote & Auto Start Feature Configuration

    Titan Central Chillers 4.10 REMOTE AND AUTO START FEATURE CONFIGURATION The MG Series control instrument is designed to require a manual restart should an interruption in power occur. The On/off button is a momentary switch. Some users require that the unit must start automatically after an interruption in power or must be started from a remote, customer supplied on/off signal. The MG Series control instrument can be configured in this...
  • Page 93 Titan Central Chillers To active the Remote Start features : Access main menu and advance to the Options menu. From the Options menu, select Remote Start. Press the Select button to advantage to the Enabled/Disable screen. Select Enabled to enable the Remote Start.
  • Page 94 © 2021 ADVANTAGE ENGINEERING, INC. RE 20210407...

Table of Contents